TucsonHydraulic automatic lifting platformTalking about the control technology process

announcer:hp391HP142030639 release time:2024-03-22 10:58:48

the legs must be opened first. If the legs are not lifted, it is strictly prohibited to lift them.

The current fixed hydraulic elevators are mainly enclosed or meshed lifting channels surrounded by buildings and light steel structures, and use hydraulic cylinders to lift the platform. Its main components are as follows: the lifting passage part: a closed or mesh frame surrounded by buildings or light steel structures, oil pumps, safety valves, fixed hydraulic lifting platform speed control valves The small oil tank cylinder part of hydraulic components such as directional valves: composed of one or more cylinders of a lifting cylinder, a straight top platform, or a lifting shear fork frame, forming a door system. The closed or mesh platform door or door system consists of a steel structure, with manual and automatic doors. Generally, open platforms do not have doors. The electrical part is composed of power, signal, safety, lighting, and other devices. The platform part is a steel structure platform that carries heavy objects, There are enclosed (i.e. cabin type) or open types, with guide rollers or guide shoes on both sides. The platform bottom can be connected to the lifting cylinder or lifting scissor type steel frame auxiliary parts, which are composed of hydraulic pipe fittings pipelines, pressure gauges, and steel structure bases; Safety devices: safety valves, limit limits, door electromechanical interlocking, rupture valves, when making a selection and electrical short circuit protection.

Tucson.Therefore, it is necessary to choose based on its model and also according to the working environment. So what are the characteristics of hydraulic lifting platforms?

Shafts must have split pins and be sufficient.

.Remove trailing spaces, remove first and last interfering characters, remove blank lines, remove non paragraph blank lines, punctuation correction: Leading space type: Number of spaces:

Pay attention to checking each part of the steel wire rope for broken wires and loose strands. If the tide passes through the relevant regulations it must be replaced immediately. The maintenance and upkeep of steel wire ropes should strictly follow the provisions of GB5144-85.

The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, it is necessary to take time to prepare accordingly. At this time, it is necessary to provide timely feedback or communicate with the manufacturer. If a voltage range is used to detect the hydraulic lifting platform, it is necessary to turn on the power in this case. The circuit schematic is used to measure the electrical circuit. At this time, the voltage value can be measured, and the voltage value can also understand where the fault point is. Therefore, in this case, it is necessary to learn to analyze.

For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems resulting in costly repairs.

production costs.Head signature:

High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

The elevator has undergone strict testing before leaving the factory. If the pressure regulating valve is adjusted arbitrarily by non manufacturers, it may cause abnormal system operation. Non professionals should not adjust the pressure regulating valve arbitrarily!


TucsonHydraulic automatic lifting platformTalking about the control technology process



Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

technological innovation.Remove and disassemble the lowering valve, blow the valve core clean with compressed air, and then reinstall it.

To understand the operation of the mechanism,TucsonHydraulic electric lifting platform, the main focus is on whether it is normal and whether there is noise during use. When faults are found, timely troubleshooting is necessary to ensure the normal operation and use of the machine. During installation, it is necessary to disassemble or adjust the rotating mechanism. In this case,TucsonHydraulic automatic lifting platform,TucsonShear difference hydraulic lifting platform, it is necessary to ensure that the rotating mechanism can be parallel to the centerline of the reducer and the centerline of the gear, and of course, the meshing clearance should also be appropriate. If this is not appropriate, then the machinery cannot operate normally.

The use of highlights is cost-effective. When aluminum alloy elevators were in the market, their price was also a significant highlight. Because manufacturers make reasonable and moderate pricing decisions in their daily processes, it is well known that manufacturers generally consider manufacturing costs when pricing. and

Tucson.Regularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated.

Head signature:

Pay attention to checking each part of the steel wire rope for broken wires and loose strands. If the tide passes through the relevant regulations, it must be replaced immediately. The maintenance and upkeep of steel wire ropes should strictly follow the provisions of GB5144-85.