Roermond 2 meter electric lifting platformWhere

announcer:hp935HP175192871 release time:2024-03-18 11:15:42

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Roermond .The occurrence of.

Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

.When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above effective protective measures should be taken.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation,Roermond Guide rail electric elevator, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.


Roermond 2 meter electric lifting platformWhere



Setting requirements: The wall bracket should use the manufacturer's matching standard products.

The down travel (limit) switch should be of the automatic reset type.

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

plan.The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit,Roermond Zoomlion Electric Elevator, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting,Roermond Guide rail electric elevator, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

The landing door should meet the requirements of the specifications and achieve standardization.


Roermond 2 meter electric lifting platformWhere



Protective measures should comply with regulatory requirements.

Inspection environment.Acceptance: Concrete strength grade C30, strength testing report.

The magnetic directional valve returns to the fuel tank. To ensure stable landing of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the landing speed does not change due to heavy objects. It is adjusted by the saving valve

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Roermond .Before installation, the installation unit should confirm that the foundation, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form embedded parts, concealed engineering acceptance form, and concrete strength report.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

Setting requirements: Each landing entrance should be equipped with a landing door, and should not open towards the lifting passage.