strawDry type transformer scb10The role of mechanical strength

announcer:hp122HP117294921 release time:2024-03-18 09:07:55

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

For no-load impulse closing of transformer,straw1600KVA box transformer price, pay attention to the following matters:

straw.The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device, the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.

(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than 1m; At the angle with actual operation, a spacing of more than 2m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.

.Equipped with a temperature controller, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer,strawBox type transformer 160KVA price,strawBasic structure of power transformer, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

In order to better avoid overvoltage damage a group of overvoltage maintenance high-voltage Arresters (such as y4cs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.

Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.

quality.The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below 2000kVA and the working voltage is below 35KV, which also ensures the rated voltage of 110kV; Oil immersed transformers are generally suitable for distribution equipment.

The method and whole process of taking oil sample of power transformer are as follows:

Oil leakage of bolt or pipe external thread


strawDry type transformer scb10The role of mechanical strength



The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

Standard requirements.The hanging core of dry-type transformer is a vital part

Several detection methods for installing transformer

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

straw.The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.

Connection group structure of dry-type transformer