BusiaElectric fork lift tableGuidelines for attention during construction

announcer:hp935HP175192871 release time:2024-03-16 13:20:41

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Busia.Construction electric elevators must be equipped with lifting cages and reusable buffers, and comply with regulatory requirements.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m,BusiaAutomatic electric elevator, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

.Use floor doors and cage door devices on construction sites where conditions permit.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.


BusiaElectric fork lift tableGuidelines for attention during construction



When the landing door is closed,BusiaElectric elevator,BusiaSmall electric elevator platform, the full width of the lifting passage opening should be covered.

When charging, it is necessary to charge it in a timely manner. When the equipment is used for about 2 months (according to the actual frequency of use), it is necessary to add grease to the rotating parts once; Regularly inspect the working status of the pin shaft of the fully self-propelled electric elevator every month, and if any pin shaft is found

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

management.Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

When the foundation is set on the roof or floor structure, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

Scheme customization.Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

The cleanliness of the hydraulic station is an important aspect of the electric elevator hydraulic station, so it should not be taken lightly. And from a professional perspective, there are relevant rules and requirements that should be referred to in the specification manual, so as to have a correct understanding and know how to achieve good cleanliness.

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

Busia.The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width and should not open towards the lifting passage.

Spiral electric lifting mechanism: With all the functions of a regular lifting platform