southern suburbs6m electric elevatorHow to increase inventory

announcer:hp935HP175192871 release time:2024-03-14 10:53:08

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

Then, the lifting platform platform platform that carries the load needs to be balanced and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

southern suburbs.Lowering platform, vehicle mounted lifting platform, self-propelled lifting platform, diesel engine curved arm self-propelled lifting platform, folding arm lifting platform, cylinder sleeve lifting platform, aluminum alloy lifting platform, and special

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

.The use of standard section connecting bolts should comply with the user manual and specification requirements.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings,southern suburbsElectric elevator lifting 10 meters, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.


southern suburbs6m electric elevatorHow to increase inventory



The verticality of the guide rail frame should meet the requirements of the specifications.

The usual operation of landing and docking. The installation position of the upper limit switch should comply with the following: when the lifting speed is less than 0.8m/s, the upper safety distance L left after the upper limit switch is triggered by the hanging cage should not be less than

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, making high-altitude operations easier


southern suburbs6m electric elevatorHow to increase inventory



There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

demand.Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.

Afterwards, it should be scrapped.

According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage,southern suburbsElectric pull rod elevator, an extended stage, a T-shaped stage, or a hall.

southern suburbs.The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends,southern suburbsFolding electric elevator, it can automatically cut off the oil circuit and stop descent

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.