as specified in the above table.

Horizontal lead screw mechanical electricity

Gaobeidian.Alarm devices can be divided into fixed and mobile platforms

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, rail type and scissor type (curved arm type) to distinguish between overload or equipment malfunction. Fixed types include: scissor lift cargo elevator, and installation

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm,GaobeidianSmall electric screw elevator, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

.During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, resulting in costly repairs.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.


GaobeidianGuide rail electric elevatorhow to use



When the landing door is closed, the full width of the lifting passage opening should be covered.

The magnetic directional valve returns to the fuel tank. To ensure stable landing of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the landing speed does not change due to heavy objects. It is adjusted by the saving valve

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter,GaobeidianElectric 6-meter elevator, clean it with compressed air,GaobeidianDingli Electric Elevator, and then return it to the oil tank and connect the pipeline.

Honest service.When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

Installation and dismantling personnel and drivers should hold certificates to work.

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.


GaobeidianGuide rail electric elevatorhow to use



After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Discount.When the landing door is closed, the full width of the lifting passage opening should be covered.

When adding hydraulic oil, we can extend the oil cylinder to the high position for filling. When filling, the lifting platform should not exceed the high position, and then retract the oil cylinder back to the low position to check if the hydraulic oil level is lower than the low position, and maintain it between the two.

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

The landing door should meet the requirements of the specifications and achieve standardization.