The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform,HanshanElectric mobile hydraulic elevator, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.

Hanshan.The usual operation of landing and docking. The installation position of the upper limit switch should comply with the following: when the lifting speed is less than 0.8m/s, the upper safety distance L left after the upper limit switch is triggered by the hanging cage should not be less than

The quality of the standard section should comply with the product manual and specification requirements.

.Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Horizontal lead screw mechanical electricity


HanshanElectric elevator lifting 10 metersWhich scope does it apply to?



The verticality of the guide rail frame should meet the requirements of the specifications.

The shutdown device (emergency stop switch) should be non automatic reset type.

The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets,HanshanMobile small electric elevator, soft scenery, etc.

Promotion.Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

Installation and dismantling personnel and drivers should hold certificates to work.


HanshanElectric elevator lifting 10 metersWhich scope does it apply to?



When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

middleman.Electric elevators used in various places.

Before each shift of work, the safety devices of the construction electric elevator should be inspected to ensure sensitivity and reliability.

The scaffolding of the parking platform should be laid tightly and firmly.

Hanshan.Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, and at this position the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.