UtrechtFactory elevatorExternal elements of compressive strength

announcer:hp323HP155335083 release time:2024-03-02 13:30:15

The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat, and in severe cases, the winding will be burned out.

The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.

Utrecht.Ensure excellent power supply at the installation site, and the electrical leakage switch must meet the requirements for construction elevators when using the distribution box. If the installed construction elevator is variable frequency, the leakage switch should be compatible with the frequency converter when selecting it.

Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten the inner hexagon. Afterwards, remove the motor shaft key.

.When working at heights exceeding 1.5 meters,Utrecht4-meter mobile elevator, safety nets or safety belts must be used.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

What kind of function can be achieved by installing the elevator? Before installation, confirm whether the motor and elevator are intact, and strictly check whether the dimensions of each part connected to the motor and elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft, and elevator groove of the motor.


UtrechtFactory elevatorExternal elements of compressive strength



Walking: assisted self-propelled, two wheel traction, self driving, and car modification.

There are three movable plates on both sides of the adjustment plate, which can effectively avoid accidentally injuring the toes of operators when the adjustment plate is lowered, ensuring the safety of equipment use.

Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten the inner hexagon. Afterwards, remove the motor shaft key.

knowledge.Nowadays, elevators are widely used and are involved in many industries. The spiral elevator is no exception and has a very good effect. But sometimes the surface of the spiral elevator will rust, which has a certain impact on work efficiency and needs to be removed. So what is the solution to the surface rust of the spiral elevator?

Elevator cables play an important role in elevators, but do you know how to choose good cables? Below, the editor will summarize how to choose good elevator cables for everyone. Long term improvement of various brand products such as elevator manufacturers, with complete designated products and quality assurance

The normally closed valve and motor are energized simultaneously; The solution is correct wiring, and the motor often closes the valve and loses power when powered on.


UtrechtFactory elevatorExternal elements of compressive strength



The appearance of hydraulic boarding bridges to customers, and the demand for boarding bridges is also increasing. However, there are not many manufacturers of corresponding boarding bridges. Many boarding bridge companies are leather bag companies, and they do not produce them themselves, resulting in high prices. What is important is that they do not have a good understanding of the technology of car booths, and there are often deviations when passing on the technical requirements of direct customers to the manufacturers. Therefore, customers who purchase boarding bridges can directly find professional manufacturers. When choosing a boarding bridge,Utrechtfork lifter, the first thing to consider is the range of use, frequency of work, rated weight, and other factors of the product, and choose a boarding bridge that is suitable for the requirements of the unit. Conduct market research based on the proposed technical parameters. The first condition for selecting a supplier is to consider the manufacturer of the boarding axle, and then the after-sales service capability. As long as it is a fixed boarding bridge with good product quality, excellent performance and complete equipment, it can be chosen at a reasonable price.

Discount.For the safety performance of high-altitude work platforms, it is necessary to have production technology, and strict management to ensure production. When in use, people, the environment, and machines are the three major links of high-altitude operations, and safety is the basic condition to ensure the smooth progress of high-altitude operations. In the following text, Jiuyi briefly describes the precautions for using high-altitude operation platforms: high-altitude operators must hold a health certificate. Individuals with mental illness, hypertension, or mental illness are not allowed to engage in high-altitude work tasks. Staff are not allowed to engage in high-altitude work while drinking alcohol or feeling mentally drained.

The rust prevention work of aerial work vehicles is generally something that needs to be paid attention to when they have not been used for a long time. How should we do anti-corrosion on the body of aerial work vehicles? This is actually a simple matter of not having to spend money on anti-corrosion at the repair station. As long as we car owners use some materials they can find on their own, we can achieve this. At the same time, paying attention to driving habits can ensure that high-altitude work vehicles do not rust. Here are a few points for reference.

Check the hydraulic oil quality and level. When the lifting platform is raised to a high position,UtrechtFully self-propelled mobile elevator, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged it should be replaced immediately; When there is looseness in the connection part, single-phase or three-phase power supply tighten the pipe joint.

Utrecht.The purpose of the hydraulic lifting platform allows users to choose the power mode and configuration according to their own usage range: the power system includes: DC power supply, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, the winding will not only overheat severely, but also burn out. When a star connected motor is mistakenly connected into a triangle or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat, and in severe cases, the winding will be burned out.

Connect the motor naturally to the elevator. When connecting, it is necessary to ensure that the concentricity of the elevator output shaft and the motor input shaft is consistent, and the outer flanges of the two are parallel. Inconsistent alignment can lead to motor shaft breakage or elevator gear wear.