ArgosWorking principle of power transformerReversal of supply and demand

announcer:hp122HP117294921 release time:2024-02-27 12:26:09

If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, such as ventilation duct, and there shall be no dirt.

Then clamp the branch pipe with your thumb, clearly put forward the glass test tube,ArgosPrice of 1250kva dry type transformer, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded,Argos2000 KVA power transformer, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary the load can be reduced or the operation of the transformer can be stopped.

The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.


ArgosWorking principle of power transformerReversal of supply and demand



Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

Protection mode for type selection of dry-type test transformer

After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

Production department.The noise of dry-type transformer comes from

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.


ArgosWorking principle of power transformerReversal of supply and demand



Sound in case of phase failure

Information recommendation.In the case of dry-type transformer operation, there is more noise, and some even cause noise, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.

During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.

Performance and main parameters of common metal composites, preparation treatment of thick steel plate blanking process, riser production and manufacturing process and quality standards of automobile oil tank, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process,Argos15KVA control transformer, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.

Argos.Dry type transformer factory

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

The method and whole process of taking oil sample of power transformer are as follows: