Neustadt3150 power transformerThe quality directly determines the quality of the pipe fittings

announcer:hp122HP117294921 release time:2024-02-26 09:06:55

Power transformer manufacturer

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

Neustadt.Power saving analysis of transformer

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.

.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked,NeustadtAbout transformer, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.


Neustadt3150 power transformerThe quality directly determines the quality of the pipe fittings



Noise dispersion of dry-type transformer

After the power transformer has been used for a long time, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:

In specific daily life we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?

quality standard.The raw materials of Fushi blue can be used for bonding,NeustadtOil immersed transformer thermometer, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times,NeustadtHow much is the 2000 box transformer, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.

A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?


Neustadt3150 power transformerThe quality directly determines the quality of the pipe fittings



The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, common faults and impact. The work is diligent.

Quality Assurance.The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

Visual inspection method for transformer inspection

After sampling, causing short circuit obstruction. If not handled properly, it will cause great damage.

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.