KovrahKs11 mining power transformerIndustry's perfect technology

announcer:hp122HP117294921 release time:2024-02-18 11:13:14

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%) it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

Kovrah.First of all, although dry-type transformer has strong moisture resistance, it is generally open structure or very susceptible to moisture, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below 70%. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than 1000 / V (operating voltage), it indicates that the transformer is seriously damp, and the trial operation shall be terminated.

After sampling,KovrahMain transformer of wind farm, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

.In specific daily life, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition,KovrahDry type transformer scb14, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a guardrail of no less than 7m shall be installed around it, and a warning sign shall be hung at a prominent position.


KovrahKs11 mining power transformerIndustry



If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, the resistance value of the grounding wire shall be measured accurately every two years.

For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation it is very easy to cause fire accidents, power failure, damage to machinery and equipment, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.


KovrahKs11 mining power transformerIndustry



Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.

Installation requirements.For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents power failure, damage to machinery and equipment, etc.

Precautions for trial operation of power transformer manufacturers

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

Kovrah.The method and whole process of taking oil sample of power transformer are as follows:

When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,

The input and output three-phase power lines shall be connected to phase a,KovrahPower transformer technology series, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.