San LorenzoRoutine test of oil immersed transformerAccuracy analysis

announcer:hp122HP117294921 release time:2024-02-14 14:23:51

the electric flow will leak into the earth along the installed grounding wires

The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, so as to achieve the purpose of safety, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

San Lorenzo.When the output power P2 of the transformer is equivalent to the input power P1, the efficiency & ETA; Equivalent, the transformer will not cause loss. But in fact, there is no such transformer. The electromagnetic energy of transformer always causes loss. The key of this kind of loss is copper loss and iron loss. Copper loss refers to the loss caused by the number of turns of transformer coil. When the current has a fever according to the number of turns of the coil, part of the electromagnetic energy changes into energy and is lost. Because the electromagnetic coil is generally wound by copper core wire with insulating layer, it is called copper loss.

The switching power supply lacks one phase of power;

.Loose core screw

The hanging core of dry-type transformer is a vital part

Sound in case of phase failure


San LorenzoRoutine test of oil immersed transformerAccuracy analysis



Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads,San LorenzoS11 type oil immersed transformer, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

Transformer

The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized,San LorenzoPower transformer calculation sheet, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.

plan.Oil leakage of bolt or pipe external thread

When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems,San LorenzoPrice of 1000 KVA dry type transformer, so as to ensure the reliable and stable operation of machinery and equipment.


San LorenzoRoutine test of oil immersed transformerAccuracy analysis



Oil leakage of cast iron parts

discount.Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

Transformer inspection ear

A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

San Lorenzo.Power transformer manufacturer

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality please cut off the input switching power supply.

When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.