GrossetoAxle Co., LtdThere are several levels of processing

announcer:hp161HP196399230 release time:2024-02-02 20:36:08

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released use a voltmeter to check whether the lowering valve is energized. If there is no power,GrossetoBoarding axle brand, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top,GrossetoProvincial Mobile Boarding Bridge, surface, and foot of the slope, especially for the simple boarding bridge.

Grosseto.The emergence of mobile boarding bridges solves the problem of cargo loading and unloading auxiliary boarding equipment for forklifts entering the ground of freight containers and the height difference between trucks. The mobile boarding bridge can adjust the height of the mobile boarding bridge to be level with the height of the container according to the height of the truck container, achieving rapid loading and unloading of goods and improving the efficiency of cargo loading and unloading. So, what are the abnormalities that can be observed during the use of the mobile boarding bridge?

The hydraulic system adopts imported Italian brand products, with excellent performance and minimal maintenance. The oil cylinder lifting power system, inclined plate, top, and small oil cylinder operation, can be adjusted smoothly. The height adjustment plate is a selected decorative plate and profile with a long service life. Various qualified manufacturers of boarding bridges are welcome to inquire by phone and sincerely invite cooperation!

.The width of the boarding bridge also requires a certain width of its own. However, it is not conducive to forklift loading and unloading of goods. If the width is too large if the width is too small, it can occupy a certain space, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is 1800mm, 2000mm, and 2100mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.

During the application process of hydraulic boarding bridges, close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.


GrossetoAxle Co., LtdThere are several levels of processing



When working on the hydraulic boarding bridge, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use,GrossetoThe boarding bridge, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, as the name suggests forklifts can also directly enter the interior of truck carriages for bulk loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

Embedded boarding bridge, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform, a helmet must be worn.

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.


GrossetoAxle Co., LtdThere are several levels of processing



Shake the handle to raise the boarding bridge to the height of the container.

Production department.Slowly reverse and park the container under the lip at the front of the boarding bridge.

Usage environment: Able to adapt to specific working environments, such as working in highly corrosive, dusty, high-temperature, and low-temperature environments.

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

Grosseto.When it comes to fixed hydraulic boarding bridges, I believe

Tighten the manual valve to close it.

As we all know