PaviaLifting hydraulic lifting platform platformHow to find the location

announcer:hp391HP142030639 release time:2024-01-31 11:28:43

two

Staying below high-altitude work sites is prohibited, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.

Pavia.In this situation, the parts should be replaced in a timely manner. I believe many people have encountered overheating in electric motors. In this case, it is necessary to stop the motor in a timely manner, and then troubleshoot the problem before continuing to use it. This way, the motor shaft can be used and the effect is good.

The following is a brief description of the precautions for using high-altitude work platforms: high-altitude workers must hold a health certificate. Individuals with mental illness, hypertension, or mental illness are not allowed to engage in high-altitude work tasks. Staff are not allowed to engage in high-altitude work while drinking alcohol or feeling mentally drained.

.Maintenance time regulations for hydraulic elevators: After 1500 hours of daily maintenance of the elevator,PaviaAutomatic hydraulic platform for lifting and lowering, repair the mechanical and electrical systems.

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean,PaviaHydraulic lifting platform,PaviaHydraulic lifting platform, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.


PaviaLifting hydraulic lifting platform platformHow to find the location



If the elevator malfunctions, non electrical professionals are not allowed to disassemble and assemble electrical appliances at will to prevent accidental connection or electric shock!

For lifting platforms without manned protection, it is strictly prohibited to carry people during use. At the same time, attention should be paid during use to prevent damage to hands, feet, and clothing.

The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

retailer.Due to the fact that the power unit of the hydraulic lifting platform requires an oil source, its structure is relatively complex, and it also has a certain degree of pollution and impact on the environment. The speed of the moving device is relatively fast, making it difficult to meet the design requirements for speed. The structure of the electric rod is very simple, occupies small space but does not have a price advantage. Therefore, a power source is used as the lifting power source, The DC motor is directly transmitted to other mechanical devices through a reducer for deceleration.

The reduction gearbox, gearbox, external gear teeth, and other parts, as well as the hydraulic oil, are all carried out according to the requirements in the table.

We


PaviaLifting hydraulic lifting platform platformHow to find the location



The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

Development Curriculum.When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

When using an electric lifting platform, there are many details that need to be noted, such as placing it on a flat surface during use to prevent tipping during work. In addition what are the precautions for using electric lifting platforms?

The product has a sturdy structure, simple and convenient installation and maintenance smooth lifting, making it an ideal and economical cargo conveying equipment for replacing elevators between low floors. The editor will share with you some common knowledge about daily maintenance of outdoor elevators: When personnel enter the interior of the lifting platform for maintenance, they must hang the elevator to prevent sudden lowering of the platform and causing casualties.

Pavia.The above detailed introduction, so that they can have a clear goal when choosing, and then choose the elevator that is suitable for customers.

The hook of the seat belt should not be hung on unstable or moving objects.

High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.