Ambodi fortaraWhat is the price of 1000 KVA transformerThere are such processing steps in processing

announcer:hp122HP117294921 release time:2024-01-29 12:29:35

(IV) the transformer on the column shall be stable and firm and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, etc. with flexible connection roads, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

Ambodi fortara.The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.

For the installation of lightning rod,Ambodi fortaraThe power supply of the transformer is, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, power failure, damage to machinery and equipment, etc.

.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, snow, wind and sand.

From the appearance the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground,Ambodi fortaraPower electronic equipment, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.


Ambodi fortaraWhat is the price of 1000 KVA transformerThere are such processing steps in processing



Solenoid insulation deterioration

There is a magnetic induction line crossing in the transformer core,Ambodi fortara10kV transformer oil immersed, which will cause induced electromotive force on the plan with the magnetic induction line. Because this electric flow creates a closed loop to generate an electric field and forms a vortex, it is called vortex. The existence of vortex makes the transformer core hot and consumes kinetic energy. This kind of loss is called vortex loss.

It will also produce many faults, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault, and short-circuit fault is more general.

Honesty is the foundation.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

Power transformer manufacturer

Oil leakage of bolt or pipe external thread


Ambodi fortaraWhat is the price of 1000 KVA transformerThere are such processing steps in processing



The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

demand.The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.

This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

Ambodi fortara.Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

Fault judgment of power transformer

The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of 0.5kg or 1kg. 2-3 bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date, sampling person, weather conditions and other materials of the oil sample.