Boda200 KVA oil immersed transformerMechanical performance index analysis

announcer:hp122HP117294921 release time:2024-01-22 16:58:05

Dry type transformer manufacturer

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

Boda.How to maintain dry-type transformer?

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.

.A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m and a guardrail of no less than 7m shall be installed around it, and a warning sign shall be hung at a prominent position.

The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?


Boda200 KVA oil immersed transformerMechanical performance index analysis



What is the wavelength of oil immersed transformer?

The domestic transformer market is slow

The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at 12 o'clock,BodaDistribution transformer recovery,BodaCustom power transformer, and the phasor of the phase voltage of the secondary side is used as the second hand.

agent.Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, the transformer was disconnected by vibration (but there was no grounding device).


Boda200 KVA oil immersed transformerMechanical performance index analysis



Sound in case of phase failure

Inspection items.Power transformer manufacturer

The top and middle of the transformer oil tank, the flange plate, barrel skin and the middle of the waterproof sleeve at the upper end of the automobile oil tank. The internal iron core and winding clamp are hot due to partial magnetic leakage, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.