Joel darshalson304 stainless steel plateHow to choose quality

announcer:hp535HP136858825 release time:2024-04-19 11:15:39

The selection of medical copper tube table, these problems are natural.

The process flow of plastic coated copper pipe: the settlement price of 904l stainless steel plate is on the high side, the steel plant made all the orders. As for the guide price, the market price rose slightly on Monday due to the positive sentiment after the festival. The working efficiency of t2 copper pipe after the expansion from Tuesday to Friday should be the same. Between the upper and lower clamping groove bodies of the alloy pipe to be flared, extends a certain length (depending on the flaring length), and then drives the upper clamping groove body to move down through the oil cylinder. Then, the flaring hydraulic cylinder drives the flaring die to the alloy pipe, so that the t2 copper pipe flaring die will stretch the alloy pipe port to expand its inner diameter in the alloy pipe port at the front end. The length of flared section can be 20200 mm. How to solve the crack of plastic coated copper pipe? How to solve the common fault of crack in case of improper operation during the construction of plastic coated copper pipe project? If it is not handled in time, there is a serious risk. Therefore, I will carry out practical operations in strict accordance with the engineering construction specifications and requirements related to immediacy, find more practical welding processes and then ensure the welding quality of electric welding. If we continue to develop plastic coated copper pipe materials under such circumstances, we will find that the price difference of plastic coated copper pipe with low-grade anti rust materials is different, and there are many reasons for the price difference. First, there are significant differences in production. Although it is made of stainless steel, the plastic coated copper pipe can be compared with the plastic coated copper pipe on the market.

Joel darshalson.Advantages: low investment cost, low production cost, high output and low price.

However it may cause recoverable temporary damage to people who have been away from these radioactive sources for a long time. The DC brushless motor with small volume and large power is adopted, which can operate without fault for a long time even if it is opened or closed. Target There will be no sharp decline in the price of copper tubes in Linyi at the end of the month. The price of plastic coated copper pipe will continue. Pop up the position line and line, select PVD chromium nitride ring and molybdenum spraying ring as the matching materials for the plastic coated copper pipe, use the self-developed opposed reciprocating wear tester, carry out the load level test, wear test, lean oil test, and research the load. As for the corrugated process of the finished plastic coated copper pipe as claimed in claim 1, it will not cause artificial damage. The basic principle of the foundation of the integral rigid flexible connection plastic coated copper pipe sluice discussed the influence of process parameters and heat treatment process on the microstructure, phase distribution and mechanical properties of the alloy, and obtained some important research results. The number of joints of steel pipes and plastic coated copper pipes on the same section shall not exceed 50% of the number of pipes. Before installation, the pipe shed shall sweep and clean the hole with drill bit or high-pressure air, and the scum in the hole shall be removed, Ensure the aperture (The hole diameter shall not be less than 127cm, and the hole depth shall meet the requirements to prevent hole plugging. Most of the seamless steel pipes produced now are hot-rolled. Because of the high temperature, the deformation resistance is relatively small, and generally the steel plate is used for rolling. In this operation, the detailed thickness of the steel plate shall also be considered. If it is about the harmful elements with relatively low accuracy requirements, plastic coated copper pipes must be required. The pipe shed can be installed, extended section by section, and What does plastic coated copper pipe with a diameter of 1 reflect in life when the weld length is added to 30 for the joint steel pipe of the pipe extension joint? Plastic coated copper pipe can also produce welded pipes with different pipe diameters from billets of the same width. However, it can be compared with straight seam pipes of the same length. The rental production rate is low.

.Attention shall be paid to the purchase of red copper pipe in order to study the distribution law of pipeline crack stress field under internal pressure. The simulation ysis and experimental verification are carried out for pipes with cracks of different shapes, different directions, different internal pressures and different sizes. The results show that the stress at the crack tip is much greater than that at the crack center. The crack shape has little effect on the stress. With the increase of the included angle between the crack direction and the pipe axis, the stress at the crack tip first increases and then decreases. With the increase of the pipe internal pressure, crack depth, and crack length, the stress at the crack tip increases linearly. Among them, the effect of crack length on the stress at the crack tip is smaller than that of internal pressure and crack depth. During the construction and operation of long-distance pipeline, due to the influence of pipe manufacturing defects, welding defects, internal and external loads, stress concentration, corrosion defects and other factors, the pipeline will produce cracks and expand cracks, which is the most dangerous defect of long-distance pipeline and the main reason for pipeline failure. At present pipeline cracks are mainly determined by internal testing and non-destructive testing after excavation. Among them, ultrasonic internal testing has a good identification rate for cracks with a length of more than 25 mm, a depth of more than 1 mm in the base metal or a depth of more than 2 mm in the weld; Magnetic flux leakage internal detection has a certain detection rate for cracks with opening more than 0.25mm, but it is difficult to identify and quantify. In NDT, magnetic particle, penetration, eddy current and radiographic methods have high detection and identification rate. The generation and propagation of cracks will cause local stress concentration in the pipeline, which is prone to brittle fracture, fatigue damage, corrosion damage and other failure phenomena, seriously affecting the service performance and reliability of long-distance pipeline. In this paper, the influence of crack shape, direction and size on the stress at the crack tip is yzed by studying the stress field distribution law of copper pipe cracks, which provides a reference for the prevention and control of pipe cracks. What problems will be encountered in the production of copper tubes. The production of copper pipe includes four steps: welding, forming, that is, starting from different circle centers, draw arcs in two radii. The red copper tube is a module made of double curves designed according to the drawings. The red copper tube is light in weight, good in rigidity and high in strength. The shapes of the red copper tubes processed are different and can be processed into various geometric shapes such as arcs and spheres. It is beautiful, elegant and colorful. Let's talk about the two main methods of processing and forming the copper tube: The hot processing and forming method is to roll the copper tube to a roughly hyperbolic shape, then heat it, then place it on the mold prepared in advance, then slowly beat it with a hammer, finally cut, weld, fold, it can be considered to break it into small pieces for forming and then splice it into large pieces. For such copper pipes, the cost is high and the production period is long. 2 Forming method of roll bending This method is to make some modifications on the roll bending machine, and change one of the shafts into a concave type and the other into a convex type. This method can form a regular copper tube like a sphere, with a small processing range, but it has great advantages for copper tubes with small radians. What problems should be paid attention to when designing the hyperboloid copper tube? Everyone knows that the design of the air conditioning copper tube is very important. To achieve the beautiful shape, exquisite workmanship and fashionable personality of the hyperboloid copper tube, first of all, the design is very critical. Some small copper tube companies are not mature enough in design and have not enough design experience, so they often have problems in design, Hyperbolic copper tube is very famous for preparing some details that we should pay attention to in the design. The sculpted copper tube is highly decorative, and the production and processing technology of hyperbolic shaped copper tube is relatively complex. Copper tube products with strong aesthetics. According to the design requirements, different shapes need to be molded for the sculpted copper tube, so the production process of sculpted aluminum veneer is relatively complex.

Attention shall be paid to the purchase of red copper pipe in order to study the distribution law of pipeline crack stress field under internal pressure. The simulation ysis and experimental verification are carried out for pipes with cracks of different shapes, different directions, different internal pressures and different sizes. The results show that the stress at the crack tip is much greater than that at the crack center. The crack shape has little effect on the stress. With the increase of the included angle between the crack direction and the pipe axis, the stress at the crack tip first increases and then decreases. With the increase of the pipe internal pressure, crack depth, and crack length, the stress at the crack tip increases linearly. Among them, the effect of crack length on the stress at the crack tip is smaller than that of internal pressure and crack depth. During the construction and operation of long-distance pipeline, due to the influence of pipe manufacturing defects, welding defects, internal and external loads, stress concentration, corrosion defects and other factors, pipeline cracks are mainly determined by internal testing and non-destructive testing after excavation. Among them which is the most dangerous defect of long-distance pipeline and the main reason for pipeline failure. At present, ultrasonic internal testing has a good identification rate for cracks with a length of more than 25 mm, a depth of more than 1 mm in the base metal or a depth of more than 2 mm in the weld; Magnetic flux leakage internal detection has a certain detection rate for cracks with opening more than 0.25mm but it is difficult to identify and quantify. In NDT, magnetic particle, penetration, eddy current and radiographic methods have high detection and identification rate. The generation and propagation of cracks will cause local stress concentration in the pipeline, which is prone to brittle fracture, fatigue damage, corrosion damage and other failure phenomena, seriously affecting the service performance and reliability of long-distance pipeline. In this paper, the influence of crack shape, direction and size on the stress at the crack tip is yzed by studying the stress field distribution law of copper pipe cracks, which provides a reference for the prevention and control of pipe cracks. What problems will be encountered in the production of copper tubes. The production of copper pipe includes four steps: welding, forming, inspection and pipe expansion.


Joel darshalson304 stainless steel plateHow to choose quality



Pay attention to the following points when using flame heating brazing: the selection of welding materials The filler metal is wire or rod, with a diameter of about 35mm. The material is: the melting temperature of wire 221 is about 0905 ℃. Its chemical composition is FB10 The composition is 2331% H3BO3 and 6071% KBF The joint form of brazed copper pipe is mostly plug-in. Before cleaning the brazed copper pipe before welding, the edge of the pipe mouth must be corrected and deburred to ensure that the pipe mouth is free of cracks or other defects. And clean the surface of the inserted part. After the red copper pipe is assembled by tack welding, it shall be fixed by tack welding. The number, size and height of tack welds shall be symmetrically and evenly distributed along the circumference from top to bottom, left to right, the flat angle position shall be used as far as possible to ensure continuous welding. Select the appropriate welding torch according to the size of the pipe joint. The flame of the former Han Dynasty should be neutral, which is easy to oxidize copper and cause cracks; The carbonization flame contains free hydrogen, which will cause pores. When heating pipes before welding, the pipe joints shall be heated evenly, and the base metal shall be heated as quickly as possible to avoid excessive temperature and heating time of the through pipe joints. During the brazing of degreased copper tube, the brazing seam and filler metal shall be under the protection of flame. In addition, it shall be noted that the brazing seam shall be naturally cooled after welding, and the weldment shall not be moved before the brazing seam has solidified. After natural cooling after welding, hot water or wet cloth shall be used to wipe the brazing seam and remove welding slag to improve corrosion resistance and reliability of post welding inspection.

In the first ten days of May, the overall order receiving quantity of Tianjin Hebei Henan Plate Plant was not ideal. According to the monitoring data, the overall order intake of medium and heavy plate mills in Tianjin Hebei Henan region in the first ten days of May remained stable and weak. Due to the weak market shock, the overall order intake of the spot steel market was relatively weak. The total quantity of orders received in the first ten days of May is only about 300000 tons, while at the end of April, the total quantity of post settlement agreements of main steel plants can exceed 300000 tons.

In addition, quartz sand is used as sand intercalation layer on the long distance uniform pavement in the middle of chemical fiber. Its wall thickness and structure are reasonable, and the plastic coated copper pipe laying process stipulates that the plastic coated copper pipe is a non-metallic material pipe with light quality, high strength and corrosion resistance. The glass fiber with epoxy resin based weight relief is coiled on the rotating hollow floor step by step according to the processing technology. It can make full use of the efficacy of raw materials achieve the goal of applying compressive strength, improve the strength and stiffness, and ensure the reliability and stability of t2 copper tube. FRP sand pipe is accepted by many customers because of its excellent resistance to solvent erosion light weight, high strength non fouling, strong durability, long service life compared with ordinary seamless steel pipe, low comprehensive project cost, convenient installation, reliability and other advantages. Plastic coated copper pipe is used in: gray and black metallurgy industry, nonferrous plate metallurgy industry, power industry, coal engineering, petroleum industry, cotton textile electromechanical engineering industry, vehicle and motorcycle processing and manufacturing industry, railway line for industrial production, shipbuilding, engineering construction, light industry, food industry, electronic industry, power, culture and art, sports culture and game entertainment, agriculture and animal husbandry, commercial services, Diagnosis, treatment and health and its national defense and civilian industries.

Installation works.In particular, it is an improved spray type passivation box for t2 copper pipe production line. The installation step of the connection structure 100 between t2 copper pipe and aluminum bar belongs to the improvement of the spray type passivation box structure for t2 copper pipe production line. The passivation solution spray box is set above the side of the passivation solution box, the inlet of the passivation solution box is located on the box wall above the passivation solution box, the upper side of the passivation solution box is installed with a passivation pump, and the inlet pipe of the passivation pump is connected with the passivation solution box, The outlet pipe of the passivation pump is connected with the upper port of the passivation liquid spray box. With reasonable structure and convenient operation, it is convenient for operators to add passivation liquid to the passivation box, clean colloidal crystals at the bottom of the passivation box, avoid equipment blockage avoid crystals adhering to the zinc layer on the surface of galvanized pipe, welding speed of t2 copper pipe, welding current, welding voltage, wire arrangement, spacing, inclination and other process parameters will affect the performance of the weld. The residual stress of final welded pipe affected by forming is divided into anti-corrosion performance of copper pipe. Copper pipe is a kind of production of pipe material, which is processed into seamless square pipe. The physical properties of copper tubes are slightly weaker than those of hot-rolled steel tubes. The copper tube adopts a two-step push tube expanding machine, which integrates cone die tube expansion data medium frequency induction heating and hydraulic press. With effective processing technology, low energy consumption, less infrastructure construction, good products, wide application fields of raw materials and products, and what are the production batches suitable for copper tube testing. When purchasing copper tubes we pay more attention to their general possibilities and observations, but this is effective for a few customers, but it is time-consuming and labor-intensive for many customers, and may not be able to accurately distinguish between them. For such problems, it is recommended to conduct a large number of inspections within a small scope of procurement, and then the following is how to conduct inspections. The dimension tolerance of the cleanliness and wall thickness of the inner cavity of the copper tube is strict. However, in the whole process of electric welding, due to the role of the molten metal material of the air conditioning copper pipe, the thickness of the pipe at the welding point will be uneven and the inside and outside of the welding will be uneven. This will cause energy consumption of the conveyor. At this time, the internal welding ground must be used for leveling. Next, we will take you to the production process of copper pipe - internal welding and calibration. At present, many materials are also used in the life of red copper pipes. Be as judgmental as possible when buying. In fact, there are many things to pay attention to when purchasing copper tubes. Want to keep high when buying. What should we pay attention to when buying copper tubes next. The daily use and market are calculated according to the weight, so you should decide how much to use before buying.

However, it is also considered that the yield ratio should be smaller to improve their safety and reliability. However, at this time, the utilization rate of materials is also low. Common sense: copper pipes for air conditioners are mainly used for conveying liquid, gas and steam; Boiler pipes and steam transmission pipes are used for the piping, including the transmission of high-temperature and high-pressure steam; Structural pipe, automobile, tractor and other industrial sectors; Pipe for petroleum industry, mainly used for oil and gas exploitation, such as casing, drill pipe and tubing, and pipe for petroleum refining and processing; Pipe for mechanical manufacturing, which is used to manufacture the race of ball bearing, the plunger, rotating shaft and body of air pump and hydraulic pump; High pressure vessel, used for manufacturing bottles, boilers, shells, etc. At present, copper pipes for air conditioners are mainly used in three aspects in practical applications. First, medical copper pipes are widely used in industrial plants, high-rise civil buildings, municipal engineering, oil platforms, bridges, railway vehicles and other fields. Because of their good plasticity, high structural stability and strong resistance to natural disasters, they are particularly suitable for building structures in earthquake prone areas. Second, the air conditioning copper pipe has high tensile strength and toughness, high buildings bridges and other steel structures have good cold bending performance and welding performance, and the section size and surface quality are well controlled, so it is widely used in vehicle manufacturing, large bridge construction, mechanical manufacturing, industrial plant components and many other industries. Third, air conditioning copper pipes are mainly used to make transmission line towers,Joel darshalson304 stainless steel plate, microwave transfer station towers, construction crane towers, elevator supports, etc. The idea is to use weather resistant steel when making iron towers to meet the service conditions of both normal temperature and low temperature. PPM pressure roll piercer used for air conditioning copper pipe tapping rolling is not replaced by inclined roll piercer used for square steel billet. The advantage of the conical piercer is that it has the consequence of rotary euphemism casting and the of restraining the shear deformation of the square circumference and the square back. Therefore, it can prevent the defects outside the steel pipe. It can be used for the perforation of agricultural materials, especially not for the reaming and fat wall perforation. When using a general piercer, the wall thickness/pitch diameter ratio (T/D limit is about 6%, while when using a square cone piercer, the T/D limit can be 2%. Tianjin Precision Steel Tube Factory will give you a brief introduction.


Joel darshalson304 stainless steel plateHow to choose quality



Attention shall be paid to the purchase of red copper pipe in order to study the distribution law of pipeline crack stress field under internal pressure. The simulation ysis and experimental verification are carried out for pipes with cracks of different shapes, different directions, different internal pressures and different sizes. The results show that the stress at the crack tip is much greater than that at the crack center. The crack shape has little effect on the stress. With the increase of the included angle between the crack direction and the pipe axis, the stress at the crack tip first increases and then decreases. With the increase of the pipe internal pressure, crack depth, and crack length, the stress at the crack tip increases linearly. Among them, the effect of crack length on the stress at the crack tip is smaller than that of internal pressure and crack depth. During the construction and operation of long-distance pipeline, due to the influence of pipe manufacturing defects, welding defects, internal and external loads, stress concentration, corrosion defects and other factors, the pipeline will produce cracks and expand cracks, which is the most dangerous defect of long-distance pipeline and the main reason for pipeline failure. At present, pipeline cracks are mainly determined by internal testing and non-destructive testing after excavation. Among them, ultrasonic internal testing has a good identification rate for cracks with a length of more than 25 mm, a depth of more than 1 mm in the base metal or a depth of more than 2 mm in the weld; Magnetic flux leakage internal detection has a certain detection rate for cracks with opening more than 0.25mm, magnetic particle, penetration, eddy current and radiographic methods have high detection and identification rate. The generation and propagation of cracks will cause local stress concentration in the pipeline which is prone to brittle fracture, fatigue damage, corrosion damage and other failure phenomena, seriously affecting the service performance and reliability of long-distance pipeline. In this paper, the influence of crack shape, direction and size on the stress at the crack tip is yzed by studying the stress field distribution law of copper pipe cracks, which provides a reference for the prevention and control of pipe cracks. What problems will be encountered in the production of copper tubes. The production of copper pipe includes four steps: welding,Joel darshalson316L stainless steel pipe, forming, inspection and pipe expansion.

Customer first.In particular, it is an improved spray type passivation box for t2 copper pipe production line. The installation step of the connection structure 100 between t2 copper pipe and aluminum bar belongs to the improvement of the spray type passivation box structure for t2 copper pipe production line. The passivation solution spray box is set above the side of the passivation solution box, the passivation solution spray box with downward sloping bottom is connected with the inlet of the passivation solution box by the outlet set on the box wall at the bottom of the inclined bottom, the inlet of the passivation solution box is located on the box wall above the passivation solution box, and the inlet pipe of the passivation pump is connected with the passivation solution box, The outlet pipe of the passivation pump is connected with the upper port of the passivation liquid spray box. With reasonable structure and convenient operation, it is convenient for operators to add passivation liquid to the passivation box, clean colloidal crystals at the bottom of the passivation box, avoid equipment blockage, avoid crystals adhering to the zinc layer on the surface of galvanized pipe, and improve the surface quality of galvanized steel pipe.

For small diameter pipes, when using filler metal, the length of filler metal is allowed to be equal to the diameter of the pipe, which is enough to fill the weld crater. One of the five major application fields of red copper plate T2, red copper bar and red copper tube: copper is the most widely used and used in the electrical and electronic industries, accounting for more than half of the total consumption. Used for various cables and wires, motors and transformers, switches and printed circuit boards; In the manufacture of machinery and transport vehicles, it is used to manufacture industrial valves and accessories, instruments, sliding bearings, molds, heat exchangers, pumps, etc.

The medical copper tube 6 is superior to the exterior wall hanging plate decorative building materials. It will be affected by microorganisms in the air all year round, accelerating the loss of its service life. 7 If the wall interface is not properly treated, the board surface also needs to be treated with interface mortar, the construction process must be strictly required and the later maintenance work must be done well. 1 Place it in the rainproof shed, and do not place heavy objects on the surface.

Joel darshalson.However, for some important parts, it is also considered that the yield ratio should be smaller to improve their safety and reliability. However, at this time, the utilization rate of materials is also low. Common sense: copper pipes for air conditioners are mainly used for conveying liquid, gas and steam; Boiler pipes and steam transmission pipes are used for the piping structure and steam transmission of steam boilers, widely used in aviation including the transmission of high-temperature and high-pressure steam; Structural pipe, automobile, tractor and other industrial sectors; Pipe for petroleum industry, mainly used for oil and gas exploitation, such as casing, drill pipe and tubing, and pipe for petroleum refining and processing; Pipe for mechanical manufacturing, which is used to manufacture the race of ball bearing, the plunger, rotating shaft and body of air pump and hydraulic pump; High pressure vessel, used for manufacturing bottles, boilers, shells, etc. At present, copper pipes for air conditioners are mainly used in three aspects in practical applications. First, medical copper pipes are widely used in industrial plants, high-rise civil buildings, municipal engineering, oil platforms, bridges, railway vehicles and other fields. Because of their good plasticity, high structural stability and strong resistance to natural disasters, they are particularly suitable for building structures in earthquake prone areas. Second the air conditioning copper pipe has high tensile strength and toughness, high buildings, bridges and other steel structures have good cold bending performance and welding performance, so it is widely used in vehicle manufacturing, large bridge construction, mechanical manufacturing, industrial plant components and many other industries. Third, air conditioning copper pipes are mainly used to make transmission line towers, microwave transfer station towers, construction crane towers, elevator supports, etc. The idea is to use weather resistant steel when making iron towers to meet the service conditions of both normal temperature and low temperature. PPM pressure roll piercer used for air conditioning copper pipe tapping rolling is not replaced by inclined roll piercer used for square steel billet. The advantage of the conical piercer is that it has the consequence of rotary euphemism casting and the of restraining the shear deformation of the square circumference and the square back. Therefore, especially not for the reaming and fat wall perforation. When using a general piercer, the wall thickness/pitch diameter ratio (T/D limit is about 6%, while when using a square cone piercer, the T/D limit can be 2%. Tianjin Precision Steel Tube Factory will give you a brief introduction.

The price can be changed, and the transaction is affected. According to the feedback from the spot operation, the morning market transaction did not follow the temperature rise: after 9:00, which was in disorder; Before ten o'clock, it was not as expected, and users were very cautious in purchasing; Around 11:00, the surrounding markets became loose and the price was low. High hanging, low selling, and low volume. The market transaction is carried out in such a trilogy, which is different from the opening. In this process, the mentality of traders has changed: from &turning to shipping&, after all, it has promoted the steel mill to sell before entering their own mouth? This is a &manic& market again: failed to continue to rise, spot prices rose; The construction site plan is not much, and the market transaction is weak - this week's trading days, the spot price rose, and the transaction was less than expected. As of noon, the sales volume of large inventory customers was hundreds of tons, and the shipment was not much. Judging from the transaction in the morning, the selling price of leading resources rose generally. Among the resources in Kuti, the base price of t2 copper tube was 5050 yuan/ton, and the price of earthquake resistant spiral snail was 5350 yuan; Among the resources provided by the factory, the basic price of threads of Zhongtian, Yonggang and Shagang is 5130 yuan, and the differential between spiral and t2 copper pipes is 360-380 yuan/ton. In terms of the market, the leading market Tangshan narrow band mainstream fell by 30-120 in the early opening. The overall trading situation of copper bars was weak. Some small factories cut prices significantly, and the low price trading was acceptable. Limited production continues, market resources are average, weak market, and downstream procurement is cautious. 355 is the consolidation of the medium broadband market. Today's futures continue to fluctuate. Traders are less willing to ship at low prices and have a strong mood. However, under the pressure of futures, the trading atmosphere in the spot market is not good. Copper bars continued to fluctuate in the morning, and traders were affected by multiple factors to make a small weak tone trial deal. From the commercial account, we know that there are few high market transactions, few inquiry calls, and a slightly pessimistic attitude. The overall market transaction atmosphere is light, and most merchants operate on the market. At present, the downstream demand is still low, the demand for terminal replenishment is low, and the purchasing enthusiasm is not high. According to traders' feedback, the current market is in a weak situation of supply and demand. Downstream feedback shows that many projects are shut down and there is a great pressure on funds. However, the relevant economic data and side news are too bearish,Joel darshalsonT2 copper bar, so the futures market is difficult to rebound, and the spot market is mainly responsible for the subsequent drop. However, some traders are still willing to maintain their prices, which is mainly due to the high price of post settlement resources and the low inventory at present. The invention relates to a manufacturing method for a double seal socket flexible connection structure of a large diameter spiral welded steel pipe.

Pay attention to the following points when using flame heating brazing: the selection of welding materials The filler metal is wire or rod, with a diameter of about 35mm. The material is: the melting temperature of wire 221 is about 0905 ℃. Its chemical composition is FB10 The composition is 2331% H3BO3 and 6071% KBF The joint form of brazed copper pipe is mostly plug-in. Before cleaning the brazed copper pipe before welding, the edge of the pipe mouth must be corrected and deburred to ensure that the pipe mouth is free of cracks or other defects. And clean the surface of the inserted part. After the red copper pipe is assembled by tack welding, it shall be fixed by tack welding. The number size and height of tack welds shall be symmetrically and evenly distributed along the circumference from top to bottom, left to right, and the tack welds shall be melted into the whole weld during brazing. When brazing the copper pipe, the flat angle position shall be used as far as possible to ensure continuous welding. Select the appropriate welding torch according to the size of the pipe joint. The flame of the former Han Dynasty should be neutral because the oxidation flame has high oxygen content, which is easy to oxidize copper and cause cracks; The carbonization flame contains free hydrogen, which will cause pores. When heating pipes before welding, the flame shall be perpendicular to the heating surface, the pipe joints shall be heated evenly, the brazing seam and filler metal shall be under the protection of flame. In addition, it shall be noted that the brazing seam shall be naturally cooled after welding, and the weldment shall not be moved before the brazing seam has solidified. After natural cooling after welding, hot water or wet cloth shall be used to wipe the brazing seam and remove welding slag to improve corrosion resistance and reliability of post welding inspection.