HagueManual pressure relief of hydraulic lifting platformWhat technologies and materials should be available before construction

announcer:hp695HP135175170 release time:2024-05-19 15:21:04

The lifting platform has been inspected and debugged before leaving the factory, and all technical indicators meet the design requirements. When in use, only the power supply needs to be connected, and the hydraulic and electrical systems basically do not need to be adjusted.

Today, be sure to add more clothes when going out. Shandong, as the hometown of elevators in China. There are countless manufacturers of all sizes. So, how to maintain and maintain the lifting stage and elevator after entering winter. Below is a detailed introduction from the editor.

Hague.The axle manufacturer's oil cylinder is leaking and the oil cylinder seal is being replaced. The lifting platform does not lower and the lowering valve is malfunctioning. When the lowering button is pressed,HagueElectric lifting platform Hydraulic lifting platform, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity,HagueHydraulic lifting platform frame, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

Regular inspection and maintenance, eliminating hidden dangers, and troubleshooting are beneficial for improving work efficiency, extending equipment service life, and ensuring the safety performance of elevators.

.Before using the machine, the staff should carefully inspect the hydraulic and electrical systems to ensure that there are no leaks or bare leaks before use.

Firstly, it is necessary to use and operate the elevator correctly. The operators should receive systematic operation training: regular inspection of operating standards should be conducted, and any violations of the elevator operation should be punished immediately. In severe cases, they should be transferred from this position. Since the passing of

Although lifting cargo elevators have good safety in practical work, if we do not pay attention to detailed maintenance, accidents may occur. Therefore, we should pay attention to them when performing daily maintenance.


HagueManual pressure relief of hydraulic lifting platformWhat technologies and materials should be available before construction



What are the advantages of installing a guide rail type elevator for goods? The advantages of civil engineering are easy to install: there is no need for a machine room above the shaft, and the top layer can be installed at a height of more than 5 meters. The computer room can be located within a radius of 15 meters of the shaft,HagueMicro hydraulic lifting platform, occupying an area of only 3-4 square meters. The hydraulic elevator is not equipped with a counterweight device to improve the utilization rate of the shaft area. The load and load cylinder of the hydraulic elevator directly act on the foundation pit and the strength requirement for the shaft is low. A brick structure or brick concrete structure shaft is sufficient.

A type of elevator equipment consisting of a walking mechanism, electric mechanism, and support mechanism. The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through the oil filter, isolation electromagnetic directional valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the isolation electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge.

When working at heights exceeding 1.5 meters, safety nets or safety belts must be used. Specializing in the production of scissor type elevators, a 20 year old brand with competitive prices and guaranteed quality!

plan.Replace with new oil and do not intermittently use old oil, otherwise the moving parts in the system will accelerate wear.

Remove and disassemble the hydraulic lift cargo elevator lowering valve, blow out the plunger with compressed air, then install it and reinstall it.

Mobile elevators are generally used in skyscrapers where electric elevators are used, as there is no need to stop midway, Skylobby) from the ground, and then transfer to the ordinary elevator to the destination. Some new elevators use elevator pre calling systems, which can pre call designated floors in the lobby. These passenger elevators can be decorated beautifully according to customer needs. Some passenger elevators are also equipped with air conditioning and television, while others are set up in the cabin, so that customers can enjoy the scenery outside while riding.


HagueManual pressure relief of hydraulic lifting platformWhat technologies and materials should be available before construction



There are foreign objects inside the oil delivery pipe of the hydraulic lifting platform, which can cause uneven force distribution during the delivery of hydraulic oil, resulting in uneven surface conditions. It is recommended to carefully check whether the delivery pipe is smooth.

Scheme customization.High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

If the lowering valve is not tightly sealed check if the lowering valve has electricity. If there is electricity, eliminate the malfunction of the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

The lifting platform has been inspected and debugged before leaving the factory, and all technical indicators meet the design requirements. When in use, only the power supply needs to be connected, and the hydraulic and electrical systems basically do not need to be adjusted.

Hague.Firstly, it is necessary to use and operate the elevator correctly. The operators should receive systematic operation training: regular inspection of operating standards should be conducted, and any violations of the elevator operation should be punished immediately. In severe cases, they should be transferred from this position. Since the passing of

The lifting platform has been inspected and debugged before leaving the factory, and all technical indicators meet the design requirements. When in use, only the power supply needs to be connected, and the hydraulic and electrical systems basically do not need to be adjusted.

Do not adjust the solenoid valve on the motor arbitrarily. The solenoid valve is pre adjusted before leaving the factory, and random adjustment can easily cause internal pressure to increase or decrease. In severe cases, it can shorten the service life of the motor.