KarlsruheIndoor hydraulic lifting platform carQuality Control

announcer:hp695HP135175170 release time:2024-02-06 12:17:23

After careful inspection, it was found that it was mainly caused by two reasons

The boxes and distribution boxes of hydraulic elevators should be kept clean regularly,KarlsruheHydraulic electric lifting platform, and dust on electrical equipment should be promptly cleaned.

Karlsruhe.Many people believe that the mechanical strength of the elevator itself is relatively high when using it, so they did not strictly follow the installation method specified in the manual during the installation process. Little did they know that this would cause increased wear and tear of the parts and inflexible operation. In addition, they should pay attention to the installation precautions corresponding to the working environment and not be careless. Proper installation, use, and maintenance of elevators are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, efficiency, and usable area of electric elevators, most high-rise buildings will divide electric elevators into arrays, with each group responsible for a portion of the floors, and make different adjustments and scheduling based on the usage mode of different floors at different times.

.When using, the four legs should be firmly supported on a solid ground (based on the walking wheel about to leave the ground), and sleepers can be used when necessary.

Familiarity with the usage process and without a doubt, this is the first thing to understand. There are two ways to understand it: first, carefully read the user manual provided by the manufacturer when the hydraulic lifting platform leaves the factory; The second is the equipment that needs to be installed. A professional installation technician will be dispatched to install the hydraulic lifting platform. After the installation is completed, relevant users will be trained on the operating process and safety precautions of the hydraulic lifting platform, and some maintenance matters in the future will also be explained; What should be paid attention to during the running-in period when using hydraulic lifting platforms? Check the wear of components. For newly processed and assembled components there may be subtle deviations in shape and size that require a period of time for running-in. Therefore, during the running-in period, and add some engine oil or grease appropriately; Confirm if there is any noise during the running-in period. If it is found that the hydraulic lifting platform is noisy during operation the manufacturer of the hydraulic lifting platform should handle it in a timely manner to avoid equipment failure; Work between the pins and bearings to ensure that they are not worn, run it several times more. After the running-in, the noise will naturally disappear. However, if there is noise for a long time and no signs of fading, please make sure to promptly produce it and solve the problem; Regularly check if the components are loose. Before use, check if there are any signs of looseness in screws, nuts, retaining rings, oil pipe joints, etc. If there are any, please reinforce or replace them in a timely manner to avoid accidents.

The pressure of the lifting platform is very important. When lifting goods, the pressure of the lifting platform will test the weight of the goods. If it is overloaded, the general lifting platform will prompt, which serves as protection. Therefore, now lifting platforms are equipped with pressure gauges. Hydraulic machinery should remind everyone to pay attention to the following points: the precautions for using small lifting platforms are based on pressure. Their load-bearing capacity is very poor and their size is small. When using the lifting platform, it is necessary to pay attention to its use. If overloaded, it will cause structural damage to the lifting platform. We have mentioned this many times before when using it.


KarlsruheIndoor hydraulic lifting platform carQuality Control



Preparation before folding and installation of the elevator. Carefully prepare a special construction plan for installation and provide safety technical disclosure to the installation personnel.

Connect the motor naturally to the elevator. When connecting, it is necessary to ensure that the concentricity of the elevator output shaft and the motor input shaft is consistent, and the outer flanges of the two are parallel. Inconsistent alignment can lead to motor shaft breakage or elevator gear wear.

Elevator customers all have overloaded use of elevators. Although elevators have a large overload capacity in design, the hidden dangers brought by such use are very large, which can easily cause damage such as oil cylinder roof fall and elevator bracket deformation. So it should be summarized as follows: Maintenance of elevators must be equipped with full-time elevator operators who have undergone on-the-job training, and illegal operation and use are strictly prohibited.

Honest management.Although lifting cargo elevators have good safety in practical work, if we do not pay attention to detailed maintenance, accidents may occur. Therefore, we should pay attention to them when performing daily maintenance.

Before installing the elevator bearings, do not open the packaging too early. This can easily lead to premature bearing contamination, which can lead to premature bearing damage. Additionally, ensure that the installation environment is clean and do not bring iron filings, dust, and other objects into the bearings. Even small dust particles can cause premature bearing damage Prolonged use can also affect the running in between bearings, leading to a decrease in the lifespan of the elevator.

Although lifting cargo elevators have good safety, in practical work, if we do not pay attention to detailed maintenance, accidents may occur. Therefore, and daily cleaning work should be carried out. Dust and debris on the motor should be cleaned in a timely manner.

Honest service.In the construction elevator, the switch box also has leakage protection equipment,Karlsruhe5 ton hydraulic lifting platform, and its wires and cables have good insulation without leakage. The metal passing through the wires is not rusted, and its damage is close to zero. His steel wire rope should comply with the corresponding configuration requirements, without any issues of strand breakage or shrinkage, and of course, the number of broken wires should not exceed the corresponding standards. His pulley movement is very flexible.

The cleaning of the elevator manufacturer requires that all parts of the elevator should be kept free of oil sludge, dirt and dust, especially the air,KarlsruheIndoor hydraulic lifting platform car, fuel and oil filter of the engine should be checked and cleaned according to the specified time to prevent impurities from entering the cylinder and oil passage, so as to accelerate the wear of moving parts. Elevator manufacturers suggest developing some maintenance systems. The regular maintenance system is based on the wear and service life of mechanical components, as well as the wear and tear patterns of oil and liquid. The maintenance system mainly determines the maintenance needs of the machinery based on the operating hours of the machinery, which has also become the planned expected maintenance system.

Firstly, it is necessary to use and operate the elevator correctly. The operators should receive systematic operation training: regular inspection of operating standards should be conducted, and any violations of the elevator operation should be punished immediately. In severe cases, they should be transferred from this position. Since the passing of

Karlsruhe.No matter what problem occurs, if encountering an unsolvable problem with a hydraulic lifting platform, it is better to produce it quickly and conveniently, and guide the manufacturer to solve it. Please pay attention to safety precautions during maintenance.

Remove and disassemble the lowering valve, blow the valve core clean with compressed air, and then reinstall it.

Are there any damages to the wires and cables of the department. We need to quickly bandage and replace the damaged department.