SeksadMicro electric hydraulic elevatorThings to pay attention to when choosing

announcer:hp935HP175192871 release time:2024-01-12 13:29:18

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

Seksad.Construction electric elevators should be equipped with travel limit switches, as follows: automatic reset type upper and lower limit switches should be installed on construction electric elevators, but the upper and lower limit switches should not be triggered as high

Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

.With the continuous improvement of urbanization level in China,Seksad6m electric elevator, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Setting requirements: Each landing entrance should be equipped with a landing door,SeksadMobile electric hydraulic elevator, which should cover the opening with its full width, and should not open towards the lifting passage.


SeksadMicro electric hydraulic elevatorThings to pay attention to when choosing



Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

There is a certain itinerary.

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

query.Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, it can automatically cut off the oil circuit and stop descent

Normal operation starts. Click on this free download of construction technical information. Safety limit devices should be installed on electric elevators for construction, with upper and lower limit switches that are sensitive and reliable.

Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, deformation, and corrosion of steel wire ropes

Seksad.Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination,Seksad10 meter self-propelled elevator, shallow foundation pit required, large stroke, stable operation, low noise, accurate positioning, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, it can be stopped arbitrarily within the range of travel.

When the wall bracket cannot meet the requirements of the construction site it should be designed and calculated separately.

As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points, and can be controlled up and down floors to achieve safe use.