GroningenElectric 6-meter elevatorOrderly advance

announcer:hp935HP175192871 release time:2024-01-10 09:05:05

The scaffolding of the parking platform should be laid tightly and firmly.

During the use period,GroningenElectric elevator small, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Groningen.A lifting platform with specifications ranging in height from 1 meter to 20 meters.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

.There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, effective protective measures should be taken.

.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

Inspection requirements.Setting requirements: The landing door should be standardized and tooled.

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.


GroningenElectric 6-meter elevatorOrderly advance



The verticality of the guide rail frame should meet the requirements of the specifications.

superior quality.During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Normal operation starts. Click on this free download of construction technical information. Safety limit devices should be installed on electric elevators for construction, with upper and lower limit switches that are sensitive and reliable.

Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

Groningen.Then,GroningenElectric cargo elevator, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform,GroningenElectric banner elevator, and the lifting of goods should try to maintain a stable and uniform speed.

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness strength, stability etc., and the production should meet the design requirements.

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, and ensure that the lifting platform can be lifted to the rated lifting height.