EvlerElectric guide rail elevator,

The entrance of each landing platform must be equipped with a landing door,EvlerElectric boom elevator, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

Emergency manual valve: In case of power failure it can cause the car to descend to the nearest floor position and open the door

Evler.Construction electric elevators should be equipped with travel limit switches, as follows: automatic reset type upper and lower limit switches should be installed on construction electric elevators, but the upper and lower limit switches should not be triggered as high

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

.The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Construction electric elevators outside the lightning protection range


EvlerRechargeable electric elevatorProspects for the development of simulation technology



There is no need to set up a computer room above the shaft like an elevator and the top floor height can be installed at least 2.5 meters.

. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, if

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

where.The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve,EvlerExternal wall electric elevator, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places, family dormitories, and

When the landing door is closed, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

Limit switches should be triggered directly by the movement of the suspension cage or its related components.

Construction electric elevators outside the lightning protection range

Evler.It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform, and high load-bearing capacity, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into 24V, diesel engines, using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates, which have anti slip, insulation and safety features. Please rest assured to use.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.