EssenLarge electric elevatorAnalysis of Causes of Blockage Failure and Discussion of Solutions

announcer:hp935HP175192871 release time:2023-12-26 09:28:06

EssenMicro electric elevator,

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

Essen.The suspension cage movement can only be resumed after operator operation.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

.Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

The verticality of the guide rail frame should meet the requirements of the specifications.


EssenLarge electric elevatorAnalysis of Causes of Blockage Failure and Discussion of Solutions



News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged,EssenSelf propelled electric elevator, making the further development of lifting platform vehicles possible.

. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, if

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Range.Setting requirements: The installation and dismantling workers, and other operators of construction electric elevators should have special construction operations.

Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.


EssenLarge electric elevatorAnalysis of Causes of Blockage Failure and Discussion of Solutions



From the perspective of the safety performance of the machinery itself those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time,EssenSelf propelled electric elevator, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

Variable cost.The L distance depends on the selected wall mount model.

The down travel (limit) switch should be of the automatic reset type.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Essen.Secondly, for the replacement of hydraulic oil on the lifting platform it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.