UlanqabElectric pull rod elevatorAnalysis of construction consumption

announcer:hp935HP175192871 release time:2023-12-25 11:56:26

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

Implementing multiple shifts of homework should fill in and submit records according to regulations.

Ulanqab.Installation position of upper limit switch: Under normal working conditions the distance between the upper limit switch and the upper limit switch is 0.15m for SC type construction electric elevators, and 0.15m for SS type construction electric elevators (person)

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

.Implementing multiple shifts of homework should fill in and submit records according to regulations.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load,UlanqabGuide rail electric elevator, can achieve multiple points, and can be controlled up and down floors to achieve safe use.


UlanqabElectric pull rod elevatorAnalysis of construction consumption



Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Construction electric elevators should be equipped with emergency stop switches and comply with regulatory requirements.

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

Which one is better.Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, and the main protective accessories include safety belts etc.


UlanqabElectric pull rod elevatorAnalysis of construction consumption



Installation and dismantling personnel and drivers should hold certificates to work.

technical service.Work is essential, guardrails, protective covers, platforms and stairs,UlanqabFixed electric hydraulic elevator, etc.

Setting requirements: Construction electric elevators should be equipped with up travel (limit) switches.

Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

Ulanqab.The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.