JiningGuide rail electric elevatorBoost innovation

announcer:hp935HP175192871 release time:2023-12-25 10:24:50

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Monthly maintenance and inspection of hydraulic lifting platform rollers,JiningTricycle electric elevator, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

Jining.The detailed reason why water cannot be used to flush the hydraulic station is that doing so will corrode the oil tank in the hydraulic station, and once water is mixed in the hydraulic station, the damage to the hydraulic system is very large. Therefore, it will simply form pipeline corrosion, and other phenomena that can cause adverse effects or results for hydraulic electric elevators. Therefore it is necessary to prevent such actions to ensure the normal operation and service life of the hydraulic station.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

.Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion,JiningSelf propelled electric elevator, Terrace, Tower, Pavilion; Ideal props.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.


JiningGuide rail electric elevatorBoost innovation



Mechanical devices controlled by cage movement should not be used to open or close the landing door.

The down travel (limit) switch should be of the automatic reset type.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

discount.Every theater is a public place with a large number of people, and safety considerations should be taken into account in stage design. According to relevant national regulations, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.

The quality of the standard section should comply with the product manual and specification requirements.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.


JiningGuide rail electric elevatorBoost innovation



Buffer. In order to increase the energy for the car to hit the top or sink to the bottom. Remove rubber or sponge from the buffer and cabin to increase their impact energy; Rope groove slipping and other accidents caused the car to suddenly fall, resulting in a safety clamp. To prevent breakage of the lifting wire rope. A safety clamp that can simultaneously cut off the power supply and stop the car from falling should be removed from the car. A car without safety tongs is not allowed to ride or carry people. If it is a simple electric elevator, there should be a safety device (such as a safety stop pin) to prevent people from suddenly falling when loading and unloading goods in the car; Electric elevators with three or more floors (including three floors) for passengers or passengers.

Workshop cost.The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

Aluminum alloy lifting platforms can be divided into single column aluminum alloy, cargo elevator, three column and four column aluminum alloy. Can be used in factories, automated warehouses, parking lots, municipal facilities,JiningElectric tricycle hydraulic elevator, docks, buildings, and installations

When the landing door is closed, the full width of the lifting passage opening should be covered.

Jining.After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.