Haji Dubos zormeniSelf propelled electric elevatorThe cause of the failure and its analysis and troubleshooting

announcer:hp935HP175192871 release time:2023-12-22 09:14:16

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators,Haji Dubos zormeniThree wheel electric elevator, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength,Haji Dubos zormeniSelf propelled electric elevator, stability,Haji Dubos zormeniElectric small elevator, etc., and the production should meet the design requirements.

Haji Dubos zormeni.The shutdown device (emergency stop switch) should be non automatic reset type.

The use of standard section connecting bolts should comply with the user manual and specification requirements.

.As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points, and can be controlled up and down floors to achieve safe use.

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.


Haji Dubos zormeniSelf propelled electric elevatorThe cause of the failure and its analysis and troubleshooting



Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

When a single steel wire rope is excessively stretched, the Electrical safety device shall stop the operation of the electric lift.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

Production department.Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.


Haji Dubos zormeniSelf propelled electric elevatorThe cause of the failure and its analysis and troubleshooting



The landing door should meet the requirements of the specifications and achieve standardization.

Product line.After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Degrees, m/s.

Implementing multiple shifts of homework should fill in and submit records according to regulations.

Haji Dubos zormeni.Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.