NuoSmall electric elevatorThe output set a new record

announcer:hp935HP175192871 release time:2023-11-29 13:59:55

The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

Nuo.The magnetic directional valve returns to the fuel tank. To ensure stable landing of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the landing speed does not change due to heavy objects. It is adjusted by the saving valve

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

.After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

The quality of the standard section should comply with the product manual and specification requirements.

Installation and dismantling personnel and drivers should hold certificates to work.


NuoSmall electric elevatorThe output set a new record



Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

The isolation and buffering rubber in various parts of the aluminum alloy electric elevator drive device are intact and tightly fitted.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Executive standard.After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.


NuoSmall electric elevatorThe output set a new record



Stage equipment safety door. To prevent personnel from extending their heads,NuoThree wheel electric elevator, its cabin should be full of doors and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

offer.The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.

Unloading platform and attached electric construction platform, etc.

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Nuo.The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations,NuoElectric tricycle elevator,NuoMobile hydraulic electric elevator, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air and then return it to the oil tank and connect the pipeline.

During normal operation, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.