MerinakElectric cargo elevatorSpot prices weaken first and then rise after the weather clears up

announcer:hp935HP175192871 release time:2023-11-28 13:34:31

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results,MerinakElectric lifting platform 2 meters, and the main protective accessories include safety belts, guardrails protective covers, platforms and stairs, etc.

.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).


MerinakElectric cargo elevatorSpot prices weaken first and then rise after the weather clears up



Use floor doors and cage door devices on construction sites where conditions permit.

Only after the operation of professional personnel can the suspension cage movement be restored.

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high,MerinakMobile small electric elevator,MerinakFire electric elevator, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

quality standard.Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

Principle of electric elevator rotary valve: When the electric elevator rises, it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.


MerinakElectric cargo elevatorSpot prices weaken first and then rise after the weather clears up



The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

Installation conditions.The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Before use we should observe whether there is any damage to the electric elevator. We can conduct a no-load test to raise and lower it. If there are any damaged parts, they should be replaced in a timely manner to prevent major accidents.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Merinak.The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.