When the landing door is closed, the full width of the lifting passage opening should be covered.

The net height of the landing door opening should not be less than 8m and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, the size of any through-hole and opening related to the distance between any door and adjacent moving parts except for the gap between the lower part of the door that should not exceed 35mm, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

Revitalization.The use of fully autonomous electric elevators can create more benefits and ensure safety in all aspects.

A complete lifting platform accessory can be selected and customized according to different places, venues, and environmental usage conditions. Meet the needs of different users. So why lifting platforms can be used and installed in so many industries and places is because they can achieve multi-purpose, demonstrate multifunctional meet various different needs, and win market demand. In modern industrial transportation processes, lifting platforms have begun to play an increasingly important role, docks, warehouses, floors, workshops and other places that require rapid loading and unloading of goods, they have played a very practical value, It has also brought great contributions to the entire industry and even the entire economic development. However, long-term operation and use of these devices inevitably lead to wear and consumption, and regular maintenance and upkeep are essential. Otherwise, both work efficiency and utilization rate will decrease, and at that time, the gains and losses will outweigh the losses.

.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.


RevitalizationElectric high-altitude elevatorQualified test report



The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

The movement of its related components is direct.

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

Management Department.Acceptance: Concrete strength grade C30, strength testing report.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

High lifting height, using side mounted oil cylinders,RevitalizationElectric portable elevator, stable operation,Revitalization200 kg electric elevator, noise free, easy maintenance,Revitalization3 meter electric elevator, and longer service life.


RevitalizationElectric high-altitude elevatorQualified test report



Implementing multiple shifts of homework should fill in and submit records according to regulations.

Installation materials.When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

Revitalization.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Advantages of electric elevator rotary valve: Simplify the installation of electric elevator pipelines; The operation is more convenient, and the valve can be opened and closed at any time; The installation of a rotary valve reduces the friction of the sealing components; Compact structure, small size, and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.