FresnoElectric pull rod elevatorStandards implemented

announcer:hp935HP175192871 release time:2024-08-31 13:59:42

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged,FresnoElectric chain elevator,Fresno3 meter small electric elevator, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

When the landing door is closed, the full width of the lifting passage opening should be covered.

Fresno.There is a certain itinerary.

Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.

.The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.


FresnoElectric pull rod elevatorStandards implemented



Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

Equal effect.

The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

ranking.Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

The counterweight guide rail should meet the specification requirements.


FresnoElectric pull rod elevatorStandards implemented



Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

packing.During normal operation,FresnoTatami electric elevator, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

It is strictly prohibited to use travel limit switches as switches to stop operation.

Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

Fresno.Use floor doors and cage door devices on construction sites where conditions permit.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark and at this position, sticky, or has foreign objects such as gravel it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

The counterweight guide rail should meet the specification requirements.