ProskovWalking electric elevatorPoor fire performance

announcer:hp935HP175192871 release time:2024-07-31 20:02:10

When the landing door is closed, the full width of the lifting passage opening should be covered.

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, cargo elevator, double column aluminum alloy, three column and four column aluminum alloy. Can be used in factories, automated warehouses, parking lots, municipal facilities, docks, buildings, and installations

The L distance depends on the selected wall mount model.

.Principle of electric elevator rotary valve: When the electric elevator rises, it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed,ProskovWalking electric elevator, and then turn the transmission handwheel to lower the plug and achieve sealing.

Advantages of electric elevator rotary valve: Simplify the installation of electric elevator pipelines; The operation is more convenient, and the valve can be opened and closed at any time; The installation of a rotary valve reduces the friction of the sealing components; Compact structure, small size, and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.

The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).


ProskovWalking electric elevatorPoor fire performance



Setting requirements: For construction electric elevators with foundations installed on roof slabs floors, or other lower suspended structures,ProskovFolding electric elevator, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

The suspension cage movement can only be resumed after operator operation.

Acceptance: Concrete strength grade C30 strength testing report.

Range.Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures,ProskovSmall electric winch elevator, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.


ProskovWalking electric elevatorPoor fire performance



During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

original.When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures the side protection device for the landing entrance should be equipped.

Before installing the construction electric elevator, the foundation should be inspected and approved before installation.

The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

Proskov.Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

When the wall bracket adopts non matching standard products, design calculations should be carried out.

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.