SergeElectric bed elevatorBrand strategy is the key to improving competitiveness

announcer:hp935HP175192871 release time:2024-07-20 09:13:01

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

To ensure safe and reliable braking of the lifting platform and prevent accidents,Serge5 meter electric spiral elevator, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

Serge.The safety overtravel of limit switches and upper limit switches should comply with regulatory requirements.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

.Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.


SergeElectric bed elevatorBrand strategy is the key to improving competitiveness



The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

Greater than 0.04s; When the hydraulic buffer is used, the oil level shall be checked, and the action of the hydraulic buffer shall be monitored by the Electrical safety switch. When the hydraulic buffer is compressed, the cage shall not

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter clean it with compressed air, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Electric elevators used in various places.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.


SergeElectric bed elevatorBrand strategy is the key to improving competitiveness



Horizontal lead screw mechanical electricity

how much.Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Setting requirements: The up travel (limit) switch should be able to automatically stop the cage running at the rated speed before reaching the upper limit switch but should not trigger the up travel (limit) switch as high

Use floor doors and cage door devices on construction sites where conditions permit.

Serge.When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Electric elevators used in various places.

Mechanical devices controlled by cage movement should not be used to open or close the landing door.