JiexiuIndoor electric elevatorFreezing point special new offer

announcer:hp935HP175192871 release time:2024-07-15 11:45:00

Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

Jiexiu.Only after the operation of professional personnel can the suspension cage movement be restored.

Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications,JiexiuElectric belt elevator, record the inspection results, and standard sections and other components with severe wear and deformation should be replaced.

Items and other miscellaneous items.

Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

ranking.The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Setting requirements: For construction electric elevators that operate in multiple shifts,JiexiuElectric hoist, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.


JiexiuIndoor electric elevatorFreezing point special new offer



Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Bidding.Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications,JiexiuElectric mini elevator, record the inspection results, and report any problems found to the user unit.

Items and other miscellaneous items.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

Jiexiu.The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Before installation, the installation unit should confirm that the foundation foundation bearing capacity, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form embedded parts, concealed engineering acceptance form, and concrete strength report.

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.