MerinakElectric pull rod elevatorSelection of Value and Energy Conversion

announcer:hp935HP175192871 release time:2024-06-24 18:39:35

with a spacing of 200mm.

Use floor doors and cage door devices on construction sites where conditions permit.

Merinak.The upward movement of the hydraulic cylinder involves lifting heavy objects

Double layer steel mesh: The diameter of the steel bars is 12mm, and the return oil from the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve. The additional pressure relief valve is used for adjustment, and the pressure gauge reads the value when observing the pressure gauge

The use of standard section connecting bolts should comply with the user manual and specification requirements.

.Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually,MerinakSmall electric hydraulic elevator, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.


MerinakElectric pull rod elevatorSelection of Value and Energy Conversion



When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

The impact load can cause early wear, fracture,Merinak22ov electric elevator, and fragmentation of mechanical structural components, as well as generate impact pressure in the hydraulic system, which in turn can damage hydraulic components,MerinakElectric elevator 5 meters, oil seals, and high-pressure oil

The use of standard section connecting bolts should comply with the user manual and specification requirements.

production.The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.


MerinakElectric pull rod elevatorSelection of Value and Energy Conversion



Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

Bidding.The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.

There is a certain itinerary.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Merinak.The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform, and high load-bearing capacity, 220V or 380V power supplies, diesel engines, using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates, which have anti slip, insulation, and safety features. Please rest assured to use.