BakersfieldMicro electric hoistWhat are the design principles of

announcer:hp935HP175192871 release time:2024-06-23 16:16:22

Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical,BakersfieldElectric small mobile elevator, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Bakersfield.Attention should be paid to the occurrence of oil leakage on the aluminum alloy lifting platform to avoid secondary damage caused by a shortage of hydraulic oil. Overloading work is prohibited during use

As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points, and can be controlled up and down floors to achieve safe use.

.The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).


BakersfieldMicro electric hoistWhat are the design principles of



When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

High altitude operations and maintenance in areas such as repair, logistics, electricity, transportation, petroleum, chemical, hotel, sports center, mining, and enterprise. The lifting system of the lifting platform is driven by hydraulic pressure, also known as hydraulic lifting

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Honest service.Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.


BakersfieldMicro electric hoistWhat are the design principles of



Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

OK or not?.When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

The up travel (limit) switch should be of the automatic reset type.

News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

Bakersfield.Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve,BakersfieldFour wheel electric elevator, it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator,BakersfieldElectric one ton elevator, with a size of 8 meters by 2 meters.

In order to meet the needs of contemporary audiences and achieve perfect effects, in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, there are suspension rods, suspension points, lighting bridges, lighting suspension cages, there are lifting platforms, car platforms turntables, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses and lifting orchestras. Some lifting platforms are equipped with turntables, dance theaters, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage craft layout, creating special atmosphere and effects