CopenhagenSelf propelled electric elevatormarket

announcer:hp935HP175192871 release time:2024-06-16 13:48:54

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Copenhagen.The down travel (limit) switch should be of the automatic reset type.

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

.The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm,Copenhagen2 ton electric elevator, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.


CopenhagenSelf propelled electric elevatormarket



The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

The up travel (limit) switch should be of the automatic reset type.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Welcome calls .Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Later, when there is a major malfunction of the lifting platform,CopenhagenElectric high-altitude elevator, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents,CopenhagenSmall car electric elevator, personnel and property losses.


CopenhagenSelf propelled electric elevatormarket



Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

Industry management.The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Construction electric elevators must be equipped with lifting cages and reusable buffers, and comply with regulatory requirements.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

Copenhagen.Horizontal lead screw mechanical electricity

When the wall bracket adopts non matching standard products, design calculations should be carried out.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.