Saint DenisMigao Electric ElevatorWhat are the pre-assembly methods on site

announcer:hp935HP175192871 release time:2024-06-14 23:37:49

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Setting requirements: The landing door should be standardized and tooled.

Saint Denis.The cargo is 0.5m.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

.Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

A complete lifting platform accessory can be selected and customized according to different places, venues, and environmental usage conditions. Meet the needs of different users. So why lifting platforms can be used and installed in so many industries and places is because they can achieve multi-purpose, demonstrate multifunctional,Saint Denis3 meter high electric elevator, meet various different needs, and win market demand. In modern industrial transportation processes lifting platforms have begun to play an increasingly important role, whether in airports,Saint DenisElectric aluminum alloy elevator, docks, warehouses, floors, workshops and other places that require rapid loading and unloading of goods, they have played a very practical value, It has also brought great contributions to the entire industry and even the entire economic development. However, and regular maintenance and upkeep are essential. Otherwise, both work efficiency and utilization rate will decrease, and at that time, the gains and losses will outweigh the losses.

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.


Saint DenisMigao Electric ElevatorWhat are the pre-assembly methods on site



Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

Lowering platform, vehicle mounted lifting platform, self-propelled lifting platform, diesel engine curved arm self-propelled lifting platform, folding arm lifting platform, cylinder sleeve lifting platform, aluminum alloy lifting platform, shallow foundation pit required, large stroke, low noise, accurate positioning, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, it can be stopped arbitrarily within the range of travel.

Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor) which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places, family dormitories, and

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.


Saint DenisMigao Electric ElevatorWhat are the pre-assembly methods on site



Spiral electric lifting mechanism: With all the functions of a regular lifting platform the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

build.When the landing door is closed, the full width of the lifting passage opening should be covered.

The up travel (limit) switch should be of the automatic reset type.

Acceptance: Concrete strength grade C30, strength testing report.

Saint Denis.Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Mechanical devices controlled by cage movement should not be used to open or close the landing door.