Saint DenisElectric hydraulic folding elevatorCompetitiveness in daily maintenance

announcer:hp935HP175192871 release time:2024-06-02 16:36:23

The motor of the hydraulic guide rail lifting platform is set around the wellbore,Saint DenisElectric brick elevator, occupying a relatively small area, improving the utilization rate of the wellbore area.

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Saint Denis.The pressure joint between the pipe joint and the rubber hose fails prematurely, causing oil leakage or pipe explosion. The oil temperature rises due to frequent action of the overflow valve.

Stage equipment safety door. To prevent personnel from extending their heads, hands and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, and concrete strength report.

From the perspective of the safety performance of the machinery itself those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery


Saint DenisElectric hydraulic folding elevatorCompetitiveness in daily maintenance



Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight greatly saving energy and reducing consumption.

The inner bearing of the roller in the device is in good condition, and a complete grease film surface is maintained between the curved surface of the roller and the main chord of the aluminum alloy electric elevator. A good grease film surface can reduce wear and noise

The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life, large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.


Saint DenisElectric hydraulic folding elevatorCompetitiveness in daily maintenance



Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

Promotion.Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, if

The counterweight guide rail should meet the specification requirements.

Saint Denis.Setting requirements: Before starting work every day and changing shifts,Saint DenisElectric brick elevator on construction site, record the inspection results, and report any problems found to the user unit.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).