The scaffolding of the parking platform should be laid tightly and firmly.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Wichito.It is strictly prohibited to use travel limit switches as switches to stop operation.

To ensure safe and reliable braking of the lifting platform and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.


WichitoElectric elevatorManufacturing process analysis



When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

High altitude operations and maintenance in areas such as repair, logistics, electricity, transportation, petroleum,WichitoElectric screw elevator, chemical,WichitoElectric elevator lifting by 4 meters, hotel, sports center, mining,WichitoElectric hydraulic folding elevator, also known as hydraulic lifting

Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

average method.Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.


WichitoElectric elevatorManufacturing process analysis



The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Price.Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

Limit switches should be triggered directly by the movement of the suspension cage or its related components.

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations which can also be selected according to customer requirements to meet customer ideal requirements.

Wichito.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer