The use of standard section connecting bolts should comply with the user manual and specification requirements.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, clean it with compressed air,El Prague6-12 meter fully automatic elevator,El PragueElectric elevator 5 meters,El PragueFour meter electric elevator, and then return it to the oil tank and connect the pipeline.

El Prague.The cleanliness of the hydraulic station is an important aspect of the electric elevator hydraulic station so it should not be taken lightly. And from a professional perspective, there are relevant rules and requirements that should be referred to in the specification manual, so as to have a correct understanding and know how to achieve good cleanliness.

When the landing door is closed, the full width of the lifting passage opening should be covered.

.The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

When the wall bracket adopts non matching standard products, design calculations should be carried out.


El PragueElectric elevator lifting platformMaintenance



Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

Items and other miscellaneous items.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

Supply chain quality management.The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.


El PragueElectric elevator lifting platformMaintenance



Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

Where can I find it?.Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

Construction electric elevators should be equipped with emergency stop switches and comply with regulatory requirements.

To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Electric elevators used in various places.