HandanElectric elevator lifting platformComparative analysis of repair process

announcer:hp935HP175192871 release time:2024-05-21 11:11:50

When the wall bracket adopts non matching standard products, design calculations should be carried out.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

Handan.Lowering platform, vehicle mounted lifting platform, self-propelled lifting platform,HandanLEGO Electric Elevator, diesel engine curved arm self-propelled lifting platform, folding arm lifting platform, aluminum alloy lifting platform, and special

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

.The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.


HandanElectric elevator lifting platformComparative analysis of repair process



A complete lifting platform accessory can be selected and customized according to different places, venues, and environmental usage conditions. Meet the needs of different users. So why lifting platforms can be used and installed in so many industries and places is because they can achieve multi-purpose, meet various different needs, and win market demand. In modern industrial transportation processes, lifting platforms have begun to play an increasingly important role, whether in airports, docks, warehouses, floors, workshops and other places that require rapid loading and unloading of goods, they have played a very practical value, It has also brought great contributions to the entire industry and even the entire economic development. However, long-term operation and use of these devices inevitably lead to wear and consumption, and regular maintenance and upkeep are essential. Otherwise, both work efficiency and utilization rate will decrease,HandanUsed electric elevator, and at that time, the gains and losses will outweigh the losses.

Items and other miscellaneous items.

The landing door should meet the requirements of the specifications and achieve standardization.

analysis.According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater,HandanBasement electric elevator, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage, a T-shaped stage, or a hall.

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.


HandanElectric elevator lifting platformComparative analysis of repair process



To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

recommend.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

8m; When the lifting speed is greater than 0.8m/s, the upper small safety distance L should meet the following requirements: L=8+0.1V2, where L is the upper safety distance; V: Increase speed

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.

Handan.After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, making high-altitude operations easier

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.