KoboshburgElectric screw elevatorAnalysis of Causes of Blockage Failure and Discussion of Solutions

announcer:hp935HP175192871 release time:2024-05-14 18:01:36

and the top layer is not affected. It can be customized according to the location and environment.

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, it can automatically cut off the oil circuit and stop descent

Koboshburg.Before each shift of work, the safety devices of the construction electric elevator should be inspected to ensure sensitivity and reliability.

As a material loading and unloading equipment recognized by customers in the lifting platform, civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points, and can be controlled up and down floors to achieve safe use.

.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings,KoboshburgElectric elevator, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology, smooth lifting and low noise.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.


KoboshburgElectric screw elevatorAnalysis of Causes of Blockage Failure and Discussion of Solutions



Acceptance: Concrete strength grade C30, strength testing report.

If the set screw is loose, be sure to pin it tightly to prevent accidents caused by the shaft pin falling off. Hydraulic oil should be kept clean and replaced every 6 months.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Quality improvement.Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.


KoboshburgElectric screw elevatorAnalysis of Causes of Blockage Failure and Discussion of Solutions



Installation and dismantling personnel and drivers should hold certificates to work.

where.During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Folding arm electric elevators are mostly driven by hydraulic means, and the source of power for the hydraulic system is hydraulic oil. Only when the hydraulic oil quantity is sufficient and the oil quality is high,KoboshburgThree meter electric elevator, can the folding arm electric elevator provide greater torque output, thereby improving work efficiency. So, how can we determine whether the newly added hydraulic oil quantity is sufficient? What is the hydraulic oil quantity standard?

The landing door should meet the requirements of the specifications and achieve standardization.

Koboshburg.Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Protective measures should comply with regulatory requirements.