After the electric elevator passes the inspection,Xilingol League3 meter electric elevator, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

Xilingol League.Lower limit switch: In normal working state, before the suspension cage touches the buffer,Xilingol League2 meter high electric elevator, the lower limit switch first acts.

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

.Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

The use of standard section connecting bolts should comply with the user manual and specification requirements.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.


Xilingol LeagueSubminiature electric elevatorInspection requirements



Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

The water cooling of hydraulic stations is generally tubular water cooling. The selection is based on the heat load to calculate the heat exchange area, while the air-cooled electric elevator uses an air cooler to calculate the heat exchange capacity based on the heat load. Then, the selection calculation is carried out under the condition of satisfying the flow rate. So these two types of cooling are different and have significant differences.

Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, shallow foundation pit required, large stroke, stable operation, low noise accurate positioning, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, it can be stopped arbitrarily within the range of travel.

target.The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station,Xilingol LeagueHigh altitude electric elevator, and the landing doors should function properly.

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

The verticality of the guide rail frame should meet the requirements of the specifications.


Xilingol LeagueSubminiature electric elevatorInspection requirements



During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Safety and health.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

Limit switches should be triggered directly by the movement of the suspension cage or its related components.

From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life, large load bearing capacity, making them suitable for use in stage equipment.

Xilingol League.Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, shallow foundation pit required, large stroke, stable operation, accurate positioning, it can be stopped arbitrarily within the range of travel.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

The landing door should meet the requirements of the specifications and achieve standardization.