RajibriElectric elevator 10 metersWork characteristics and risk factors

announcer:hp935HP175192871 release time:2024-04-17 09:27:02

Use floor doors and cage door devices on construction sites where conditions permit.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Rajibri.8m; When the lifting speed is greater than 0.8m/s after the upper limit switch is triggered by the hanging cage, the upper small safety distance L should meet the following requirements: L=8+0.1V2, where L is the upper safety distance; V: Increase speed

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, otherwise impact loads will inevitably occur and mechanical operations should be avoided, causing frequent mechanical failures and greatly shortening the service life. Generated during homework

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm,RajibriIndoor small electric elevator,RajibriElectric small elevator, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

Direct material.Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, stability, etc., and the production should meet the design requirements.

When the landing door is closed, the full width of the lifting passage opening should be covered.


RajibriElectric elevator 10 metersWork characteristics and risk factors



Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places, family dormitories, and

Finance Department.Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Do not move after lifting, and do not lift until the four legs are firmly supported.

The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

Rajibri.Electric elevators used in various places.

Spiral electric lifting mechanism: With all the functions of a regular lifting platform,RajibriMigao Electric Elevator, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.