MassaBasement electric elevatorOther elements of sealing function

announcer:hp935HP175192871 release time:2024-04-13 09:16:05

The landing door should meet the requirements of the specifications and achieve standardization.

Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower,MassaElectric cargo elevator, Pavilion; Ideal props.

Massa.The upward movement of the hydraulic cylinder involves lifting heavy objects, and the return oil from the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve. The additional pressure relief valve is used for adjustment and the pressure gauge reads the value when observing the pressure gauge

Setting requirements: Each landing entrance should be equipped with a landing door,MassaElectric chain elevator, which should cover the opening with its full width, and should not open towards the lifting passage.

.After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.


MassaBasement electric elevatorOther elements of sealing function



News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved,Massa6 meter high electric elevator, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

The isolation and buffering rubber in various parts of the aluminum alloy electric elevator drive device are intact and tightly fitted.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

middleman.Use floor doors and cage door devices on construction sites where conditions permit.

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., and the production should meet the design requirements.


MassaBasement electric elevatorOther elements of sealing function



To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, ensuring the safety of the cast members.

Interpretation and observation.Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators the verticality deviation of the guide rail frame should not exceed (5/1000) h.

When adding hydraulic oil, it is also necessary to pay attention to the structure of the oil cylinder. Some oil cylinders are relatively complex internally, and how many lifting operations need to be carried out during filling to fully fill each position of the hydraulic oil. Therefore, when filling, try to add as much as possible, and then test and run the machine empty to see if it reaches the rated position.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

Massa.Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

The counterweight guide rail should meet the specification requirements.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.