SacramentoCurved arm electric elevatorThe industry shapes a new image of civilization

announcer:hp935HP175192871 release time:2024-04-06 12:48:21

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

Sacramento.During maintenance or when problems occur, the power supply should be cut off in a timely manner. After lifting, the aluminum alloy electric elevator should be firmly fixed before maintenance can be carried out. It is strictly prohibited to operate with defects to avoid accidents.

Horizontal lead screw mechanical electricity

.The scaffolding of the parking platform should be laid tightly and firmly.

During normal operation,SacramentoElectric mobile elevator, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise measures should be taken to make it meet the requirements,SacramentoElectric elevator for balcony, electric elevators should stack the goods neatly or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down


SacramentoCurved arm electric elevatorThe industry shapes a new image of civilization



When the wall bracket adopts non matching standard products, design calculations should be carried out.

High altitude operations and maintenance in areas such as repair, logistics, electricity, transportation, petroleum, chemical, sports center, mining,SacramentoElectric lifting platform 2 meters, and enterprise. The lifting system of the lifting platform is driven by hydraulic pressure, also known as hydraulic lifting

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Information recommendation.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Use floor doors and cage door devices on construction sites where conditions permit.

Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.


SacramentoCurved arm electric elevatorThe industry shapes a new image of civilization



Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

consumption.The verticality of the guide rail frame should meet the requirements of the specifications.

Afterwards, it should be scrapped.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

Sacramento.The counterweight guide rail should meet the specification requirements.

Setting requirements: The landing door should be standardized and tooled.

From the perspective of the safety performance of the machinery itself, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery