Biawestock2 meter micro electric lifting platformIndustry production method

announcer:hp935HP175192871 release time:2024-03-29 11:40:44

Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Biawestock.The magnetic directional valve returns to the fuel tank. To ensure stable landing of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the landing speed does not change due to heavy objects. It is adjusted by the saving valve

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

.The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings, a half height middle crossbar and a toe board at least 150mm above the ground.


Biawestock2 meter micro electric lifting platformIndustry production method



Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high,BiawestockElevator electric 6 meters, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

A lifting platform with specifications ranging in height from 1 meter to 20 meters.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

device management.Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength,BiawestockThree meter electric elevator, etc., and the production should meet the design requirements.

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability etc., and the production should meet the design requirements.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.


Biawestock2 meter micro electric lifting platformIndustry production method



The L distance depends on the selected wall mount model.

Variable cost.Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed,BiawestockGuide rail electric elevator, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

Construction electric elevators should be equipped with travel limit switches, as follows: automatic reset type upper and lower limit switches should be installed on construction electric elevators, but the upper and lower limit switches should not be triggered as high

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

Biawestock.Principle of electric elevator rotary valve: When the electric elevator rises, and then turn the transmission handwheel to lower the plug and achieve sealing.

The motor of the hydraulic guide rail lifting platform is set around the wellbore it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed, occupying a relatively small area, improving the utilization rate of the wellbore area.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.