MerinakRechargeable electric elevatorWhat to do after analysis

announcer:hp935HP175192871 release time:2024-03-22 09:53:29

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., and the production should meet the design requirements.

Every theater is a public place with a large number of people,MerinakMicro electric hydraulic elevator, and safety considerations should be taken into account in stage design. According to relevant national regulations, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.

Merinak.Aluminum alloy lifting platforms can be divided into single column aluminum alloy cargo elevator, double column aluminum alloy, three column and four column aluminum alloy. Can be used in factories, automated warehouses, parking lots,MerinakElectric elevator factory, docks, buildings, and installations

The quality of the standard section should comply with the product manual and specification requirements.

.When the wall bracket cannot meet the requirements of the construction site, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.


MerinakRechargeable electric elevatorWhat to do after analysis



Low power consumption: When the hydraulic guide rail lifting platform descends it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

Check whether the sealing of components such as the oil cylinder, oil pipe, and motor of the aluminum alloy electric elevator is good and whether there is any air leakage.

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

Excellent service.Installation and dismantling personnel and drivers should hold certificates to work.

Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods,MerinakElectric guide rail elevator, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.


MerinakRechargeable electric elevatorWhat to do after analysis



When the wall bracket adopts non matching standard products, design calculations should be carried out.

Test conclusion.Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

Construction electric elevators should be equipped with upper limit switches that are sensitive and reliable.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Merinak.The setting of the cable guide frame should comply with the user manual and regulatory requirements.

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, with a size of 8 meters by 2 meters.