LimestoneNew electric elevatorHow to judge good or bad with eyes

announcer:hp935HP175192871 release time:2024-03-13 10:05:49

LimestonePure electric curved arm elevator,LimestoneElectric tatami elevator,

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

Limestone.Steel wire rope construction electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, wide working platform, and high bearing capacity,LimestoneElectric boom elevator, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

.With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore in order to meet the needs of the domestic market and the public, for the replacement of hydraulic oil on the lifting platform efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Secondly, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.


LimestoneNew electric elevatorHow to judge good or bad with eyes



Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

Steel wire rope construction electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the lifting cage until it is approved by a professional

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

Product range.Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

From the perspective of the safety performance of the machinery itself, those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

Implementing multiple shifts of homework should fill in and submit records according to regulations.


LimestoneNew electric elevatorHow to judge good or bad with eyes



Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Sampling inspection.Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places, family dormitories, and

The top of the hanging cage is accessible; d) During installation/disassembly/maintenance/inspection of the device; e) Inside the hanging cage.

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

Limestone.After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Horizontal lead screw mechanical electricity

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.