JinzhouElectric three wheel elevatorWhat acceptance work needs to be done

announcer:hp935HP175192871 release time:2024-03-06 09:30:06

Jinzhou200 kg electric elevator,

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

Jinzhou.The suspension cage movement can only be resumed after operator operation.

Every theater is a public place with a large number of people, and safety considerations should be taken into account in stage design. According to relevant national regulations, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.

.There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.


JinzhouElectric three wheel elevatorWhat acceptance work needs to be done



Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

The usual operation of landing and docking.

Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

Quality Assurance.Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m,JinzhouElectric basket elevator, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.


JinzhouElectric three wheel elevatorWhat acceptance work needs to be done



According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage an extended stage, an island stage, an intermediate stage, a T-shaped stage or a hall.

Direct labor.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

Items and other miscellaneous items.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Jinzhou.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter clean it with compressed air,Jinzhou3 meter small electric elevator, and then return it to the oil tank and connect the pipeline.

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.